Exam 20: Screen-Film Radiographic Quality Control

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The first step of the QA recommended by The Joint Commission (TJC) is to __________________.

Free
(Multiple Choice)
4.9/5
(77)
Correct Answer:
Verified

C

Medical facilities have quality control programs in place in order to _________________.

Free
(Multiple Choice)
4.9/5
(81)
Correct Answer:
Verified

D

What is the testing device used to measure cassette screen-film contact?

Free
(Multiple Choice)
4.9/5
(88)
Correct Answer:
Verified

B

A quality control program is for ____________________.

(Multiple Choice)
4.8/5
(94)

Filtration is measured with _____________ measurements.

(Multiple Choice)
4.9/5
(86)

Acceptance testing should never be done by a ______________________.

(Multiple Choice)
4.8/5
(79)

The minimum HVL for an x-ray machine operated at 70 kVp is _________________.

(Multiple Choice)
4.9/5
(76)

A positive beam limitation (PBL) device is involved in __________________.

(Multiple Choice)
4.7/5
(85)

When a light in a viewbox is out, _____________________.

(Multiple Choice)
4.9/5
(81)

A quality assurance program monitors __________.

(Multiple Choice)
5.0/5
(81)

It is acceptable to perform a(n) _________ test instead of measuring the focal spot size.

(Multiple Choice)
4.8/5
(80)

Following a good processor QC program reduces the need for __________ maintenance.

(Multiple Choice)
5.0/5
(99)

Probably the most important patient protection characteristic of a radiographic imaging system is ______________.

(Multiple Choice)
4.9/5
(73)

The x-ray field must center accurately to within ____% of SID.

(Multiple Choice)
4.8/5
(67)

Focal spot size is measured with ________________.

(Multiple Choice)
4.9/5
(72)

The collimator must be accurately aligned to within ±_____% of the SID.

(Multiple Choice)
5.0/5
(83)

All general purpose radiographic units must have a minimum of _____ mm Al filtration.

(Multiple Choice)
4.7/5
(91)

A QC program should include _________________, routine performance monitoring, and maintenance.

(Multiple Choice)
4.9/5
(80)

Comparing the mR output at 50 mA at 0.2 sec, 100 mA at 0.1 sec, and 200 mA at 0.05 sec is part of a test for ________________.

(Multiple Choice)
4.8/5
(69)

Quality control testing procedures should be performed on ______________ basis.

(Multiple Choice)
4.8/5
(89)