Exam 13: Material Requirements Planning Mrp and Erp

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Each X requires 2 of component Y and 1 of part W. Each Y requires 10 of Z. Each W requires 3 of Q and 2 of R. Lead times are X = 1 week, Y = 1 week, W = 2 weeks, R = 1 week, Z = 3 weeks, and Q = 3 weeks. Construct the time-phased product structure.

(Essay)
4.9/5
(88)

"Phantom bills" are bills of material for subassemblies that do not exist in reality.

(True/False)
5.0/5
(68)

Which of the following lot-sizing techniques results in the lowest holding costs?

(Multiple Choice)
4.9/5
(72)

Effective use of MRP and other dependent demand models does NOT require which of the following?

(Multiple Choice)
4.8/5
(73)

Which of the following best describes a gross material requirements plan?

(Multiple Choice)
5.0/5
(85)

The minimum record accuracy required for successful MRP is approximately which of the following?

(Multiple Choice)
4.8/5
(84)

Product A is made from 2 Bs and 1 C. Lead times for A, B, and C are 2, 1, and 2 weeks respectively. Currently there are 2 Bs and 5 Cs on hand, with 5 of each scheduled to arrive at the end of week 1. If 20 As are needed during week 5, can the order be completed (it is the start of week 0 currently)?

(Essay)
4.9/5
(85)

An order for 150 units of Product M has been made. There are currently 30 units of Product M on hand. Each M requires 8 units of Component N. There are 200 units of N on hand. (a) Calculate the net requirements for M. (b) Calculate the gross requirements for N. (c) Calculate the net requirements for N.

(Essay)
4.8/5
(78)

What do we mean by closed-loop MRP?

(Essay)
4.7/5
(57)

Gross material requirements do not take into account the amount of inventory on hand.

(True/False)
4.8/5
(91)

Fourteen A washers, five B washers, three C washers, two D bolts, and eight E bolts are required to make one grill parts kit. If 100 grill parts kits are needed, how many more washers will be consumed than bolts?

(Essay)
4.9/5
(74)

Closed-loop MRP systems allow production planners to move work between time periods to smooth the load or to at least bring it within capacity.

(True/False)
4.7/5
(92)

MRP can be effective only if very accurate lot sizes are calculated in advance.

(True/False)
4.8/5
(83)

DRP is a time-phased stock-replenishment plan for all levels of a distribution network.

(True/False)
4.9/5
(77)

Consider the following product structure. Consider the following product structure.   If the demand for product A is 50 units, how many units of component D will be needed? If the demand for product A is 50 units, how many units of component D will be needed?

(Multiple Choice)
5.0/5
(67)

What does enterprise resource planning (ERP) allow an organization to do?

(Essay)
4.9/5
(82)

It is week 1 and there are currently 20 As in stock. We need 300 As at the start of week 5. If there are scheduled receipts planned for week 3 and week 4 of 120 As each and A has a lead time of 2 weeks, when and how large of an order should be placed to meet the requirement of 300 As?

(Multiple Choice)
4.7/5
(91)

Blockchain software replaces paper-based transaction records with digital-based records to reduce the complexity of what?

(Multiple Choice)
4.7/5
(72)

Which of the following statements regarding the gross material requirements plan is TRUE?

(Multiple Choice)
4.9/5
(80)

What are time fences? Why are they used?

(Essay)
4.7/5
(69)
Showing 101 - 120 of 133
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)