Exam 13: Material Requirements Planning Mrp and Erp

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The time-phased product structure, unlike the bill of material, adds the concept of lead times.

(True/False)
4.8/5
(79)

In MRP, the number of units projected to be available at the beginning of each time period refers to:

(Multiple Choice)
4.9/5
(82)

Audrey Ross, operations manager for BCD Technologies, must schedule work for the next five days. Each unit takes 20 minutes to process. Available capacity is 8 hours per day. The production order quantities are 18, 28, 38, 16, and 20 for Monday through Friday, respectively. What should be the plan for Wednesday?

(Multiple Choice)
4.8/5
(78)

By convention, what is the top level in a product structure?

(Multiple Choice)
4.9/5
(83)

________ strategically alters lead times and precisely places safety stock within the BOM structure to improve MRP performance.

(Short Answer)
4.9/5
(87)

Capacity planning in closed-loop MRP:

(Multiple Choice)
4.8/5
(69)

Planning bills of material are bills of material for "kits" of expensive items such as CPUs and motherboards.

(True/False)
4.8/5
(73)

A manufacturing company is trying to determine the cost of materials used to produce an A. If Ds cost $3 and Fs cost $5, how much does it cost to produce an A (in D and F materials only)? A manufacturing company is trying to determine the cost of materials used to produce an A. If Ds cost $3 and Fs cost $5, how much does it cost to produce an A (in D and F materials only)?

(Essay)
4.9/5
(80)

Product A is made from 2 Bs and 1 C. Lead times for A, B, and C are 2, 1, and 2 weeks respectively. Currently there are 2 Bs and 5 Cs on hand, with 5 of each scheduled to arrive at the end of week 1. If 20 As are needed during week 3, can the order be completed (it is the start of week 0 currently)?

(Essay)
4.9/5
(86)

________ are the result of adjusting gross requirements for inventory on hand and scheduled receipts.

(Essay)
5.0/5
(92)

A grill assembly takes 20 washers. Instead of listing these washers separately, they are grouped into a single kit for production. How is the bill of material for the washers classified?

(Multiple Choice)
4.9/5
(76)

Wheeled Coach uses ________ as the catalyst for low inventory, high quality, tight schedules, and accurate records.

(Short Answer)
4.8/5
(66)

What lot-sizing technique is generally preferred when inventory holding costs are extremely high?

(Multiple Choice)
4.8/5
(70)

Describe the tactics for load smoothing in MRP.

(Essay)
4.7/5
(78)

DRP pushes inventory through the system.

(True/False)
4.9/5
(84)

A material requirements plan contains information with regard to all of the following EXCEPT:

(Multiple Choice)
5.0/5
(82)

If X consists of one A and one B, and each A consists of one F and two Gs, then A is the "parent" component of G.

(True/False)
4.9/5
(75)

The quantity required of a dependent demand item is computed from the demand for the final products in which the item is used.

(True/False)
4.8/5
(86)

Explain the difference between a gross requirements plan and a net requirements plan.

(Essay)
4.9/5
(80)

Smoothing a resource requirements profile to stay within capacity limits may increase setup costs.

(True/False)
4.9/5
(81)
Showing 41 - 60 of 133
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)