Exam 13: Material Requirements Planning Mrp and Erp

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is FALSE concerning enterprise resource planning (ERP)?

(Multiple Choice)
4.8/5
(80)

In MRP, a "bucket" refers to a fixed order quantity, such as an EOQ.

(True/False)
4.9/5
(77)

Which of the following statements is TRUE about pegging?

(Multiple Choice)
4.9/5
(79)

Which of the following statements is TRUE about the MRP plan when using lot-for-lot ordering?

(Multiple Choice)
4.8/5
(65)

Consider the following requirements for an office chair product. Consider the following requirements for an office chair product.   The company has a setup cost of $100, a holding cost per week of $5, beginning inventory of 100, and lead time of 1 week. If a lot-for-lot policy is used, what will be the total setup cost for this six-week inventory period? The company has a setup cost of $100, a holding cost per week of $5, beginning inventory of 100, and lead time of 1 week. If a lot-for-lot policy is used, what will be the total setup cost for this six-week inventory period?

(Multiple Choice)
4.8/5
(84)

Which of the following is NOT one of the four key tasks that Wheeled Coach insists are necessary for successful MRP implementation?

(Multiple Choice)
4.9/5
(78)

________ is an information system for identifying and planning the enterprise-wide resources needed to take, make, ship, and account for customer orders.

(Short Answer)
4.9/5
(85)

Lead times, inventory availability, and bills of material are among the five things operations managers must know for effective use of dependent inventory models.

(True/False)
4.9/5
(96)

Which of the following is NOT one of the five components of DDMRP?

(Multiple Choice)
4.7/5
(68)

The large parts of a playground A-frame (from which to hang a swing or glider) consist of a ridge pole, four legs, and two side braces. Each leg fastens to the ridge with one fastener set. Each side brace requires two fastener sets for attachment to the legs. There is one order outstanding, to make 180 frame kits. There are 500 legs and 20 ridge poles in inventory. There are no other large items in inventory, and no scheduled receipts. (a) Draw the product structure tree. (b) Calculate the net requirements to fulfill the outstanding order.

(Essay)
4.8/5
(86)

________ are a way of allowing a segment of the master schedule to be designated as "not to be rescheduled."

(Short Answer)
5.0/5
(82)

Firms may discover that, rather than adapting ERP to the way they do business, they have to adapt the way they do business to accommodate the ERP software.

(True/False)
4.9/5
(73)

What is one of the tools that is particularly useful in reducing system nervousness in an MRP system?

(Multiple Choice)
4.9/5
(68)

Distribution resource planning (DRP) is:

(Multiple Choice)
5.0/5
(82)

MRP is generally applicable to items with independent demand.

(True/False)
4.9/5
(77)

Operations splitting sends pieces to the next operation before the entire lot is completed on the previous operation.

(True/False)
4.8/5
(97)

Bills of material organized by major subassemblies or by product options are called ________.

(Short Answer)
4.9/5
(78)

________ is a lot-sizing technique that generates exactly what is required to meet the plan.

(Short Answer)
4.7/5
(68)

An order for 110 units of Product A has been made. There are currently 60 units of Product A on hand. Each A requires 2 units of Part B. There are 30 units of B available. (a) Calculate the net requirements for A. (b) Calculate the gross requirements for B. (c) Calculate the net requirements for B.

(Essay)
4.8/5
(81)

Which of the following statements regarding lot-sizing is TRUE?

(Multiple Choice)
4.9/5
(79)
Showing 61 - 80 of 133
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)