Exam 8: Flexible Budgets and Variance Analysis

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Differences between the static-budget amounts and the flexible budget

(Short Answer)
4.8/5
(86)

Price variances reflect the organization's efficiency at actual levels of activity.

(True/False)
4.8/5
(86)

Favorable flexible-budget variances are good.

(True/False)
4.8/5
(70)

In most companies, variances are investigated only if they exceed a minimum dollar or percentage deviation from budgeted amounts.

(True/False)
4.8/5
(78)

This variance measures how effective managers have been in meeting the planned sales objective.

(Short Answer)
4.9/5
(83)

In a manufacturing area of an organization, poor product design, problems with the quality of materials, and scheduling conflicts will, more than likely, result in a n) _____ materials efficiency variance.

(Multiple Choice)
4.7/5
(76)

Roger Company planned to produce 12,000 units.Processing required 16,000 machine hours at a cost of $15,000 + $10.50 per machine hour.Actual sales were 14,000 units requiring 20,000 machine hours.Actual processing cost was $222,000._____ is the activity-level variance for processing.

(Multiple Choice)
4.8/5
(67)

Efficiency is indicated by _____.

(Multiple Choice)
4.8/5
(87)

The difference between the actual cost-driver activity and the amount allowed for the actual output achieved costed at the standard variable-overhead rate

(Short Answer)
4.8/5
(93)

Using standard costs is popular with companies in the United States.

(True/False)
4.9/5
(81)

What are some common causes of quantity variances?

(Essay)
5.0/5
(77)

Job set-up costs for Rob Ublind Company are variable costs based on the number of jobs.Rob Ublind Company expected to work 600 jobs at a total cost of $189,000.Rob Ublind Company worked a total of 630 jobs and actual job set-up costs totaled $177,000. Required: Compute the master-budget variance, activity-level variance, and flexible-budget variance for job set-up costs.

(Essay)
4.8/5
(101)

What are two possible interpretations of "currently attainable standards"?

(Essay)
4.9/5
(67)

Farm Bureau Insurance Company had a static budgeted operating income of $8.6 million; however, actual income was $6.4 million._____ is the static-budget variance of operating income.

(Multiple Choice)
4.9/5
(82)

Purple Company planned to produce 12,000 units.Processing required 16,000 machine hours at a cost of $15,000 + $10.50 per machine hour.Actual sales were 14,000 units requiring 20,000 machine hours.Actual processing cost was $222,000._____ is the flexible-budget variance for processing.

(Multiple Choice)
4.8/5
(66)

An activity-based budget is based on budgeted costs for every activity and related cost driver.

(True/False)
4.7/5
(83)

Materials price variance = actual price - standard price) x standard quantity allowed.

(True/False)
4.8/5
(79)

The labor flexible-budget variance equals the labor price variance plus the labor quantity variance.

(True/False)
4.9/5
(72)

A flexible budget adjusts for changes in sales volume and other cost-driver activities.

(True/False)
4.8/5
(99)

A variance is the difference between _____.

(Multiple Choice)
4.8/5
(85)