Exam 17: Waiting Lines
Exam 1: Using Operations to Create Value100 Questions
Exam 2: Process Strategy and Analysis245 Questions
Exam 3: Quality and Performance195 Questions
Exam 4: Capacity Planning108 Questions
Exam 5: Constraint Management136 Questions
Exam 6: Lean Systems164 Questions
Exam 7: Project Management140 Questions
Exam 8: Forecasting150 Questions
Exam 9: Inventory Management207 Questions
Exam 10: Operations Planning and Scheduling149 Questions
Exam 11: Resource Planning125 Questions
Exam 12: Supply Chain Design77 Questions
Exam 13: Supply Chain Logistic Networks114 Questions
Exam 14: Supply Chain Integration111 Questions
Exam 15: Supply Chain Sustainability73 Questions
Exam 16: Decision Making107 Questions
Exam 17: Waiting Lines108 Questions
Exam 18: Special Inventory Models53 Questions
Exam 19: Linear Programming86 Questions
Exam 20: Simulation54 Questions
Exam 21: Financial Analysis55 Questions
Exam 22: Acceptance Sampling Plans87 Questions
Exam 23: Measuring Output Rates106 Questions
Exam 24: Learning Curve Analysis51 Questions
Exam 25: Operations Scheduling120 Questions
Exam 26: Layout36 Questions
Select questions type
The exponential distribution is based on the assumption that each service time is ________ of those that preceded it.
(Essay)
4.8/5
(92)
The four elements common to all waiting-line situations are a customer population,a waiting line of customers,the service facility,and a priority rule.
(True/False)
4.8/5
(82)
Scenario B.6
The Jackson Machine Company has four cutting tools that need to be refurbished after an average of 30 hours,according to an exponential distribution.The single machine that refurbishes the tools needs 15 hours for each tool on the average,with exponential service times.
-Use the information in Scenario B.6.What is the probability that there will be no tools in the system?
(Multiple Choice)
4.9/5
(62)
Instead of having one worker perform all eight steps to process a customer,an operations manager assigns each step to a different worker.In doing so,the operations manager has increased the:
(Multiple Choice)
4.8/5
(87)
The production rate has been steady at 20 units per hour.The average work-in-process inventory at this station is 15 units.What is the average lead time through this manufacturing station?
(Multiple Choice)
4.7/5
(80)
Students arrive at a university business library during peak evening hours at a rate of 40 students every half hour.Each student stays an average of two hours.On average,how many students are in the library at any one time?
(Multiple Choice)
4.9/5
(87)
If the nature of the customer population,constraints on the line,the priority rule,and the service time distribution renders waiting line theory no longer useful,then an operations manager should rely on:
(Multiple Choice)
4.8/5
(68)
A drive thru car wash can process cars at a rate of one every five minutes.When you arrive with your car,you see one car just leaving the washer and eight cars in line ahead of you.How long can you expect to wait before you will reach the car wash?
(Multiple Choice)
4.8/5
(77)
In a waiting-line problem,increasing advertising expenditures,increasing the number of promotions,or changing the price of a service is most likely to affect:
(Multiple Choice)
5.0/5
(88)
With a single-server model,increasing the service rate while holding all other factors constant will:
(Multiple Choice)
4.8/5
(76)
For what number of theater patrons n is the likelihood about a coin flip that there will be that number or fewer based on Scenario B.1?
(Multiple Choice)
4.7/5
(71)
Customers arrive at the local grocery store at a steady rate of 40 an hour.Thirty percent of these customers purchase 10 items or less and go to the express line where they enjoy an average checkout time of 5 minutes.Customers that don't meet the express line criterion go to the other checkout line where they spend an average of 10 minutes checking out.How many people are checking out in the express line on average?
(Multiple Choice)
4.9/5
(80)
Customers are serviced at a rate of six customers per hour according to an exponential distribution.What is the probability that customer service will require fewer than 20 minutes?
(Multiple Choice)
5.0/5
(90)
The standard assumption in the single-server model is that customers are served according to the earliest due date,i.e. ,which customer needs to be finished first.
(True/False)
4.8/5
(88)
Twelve customers arrive at the lunch counter at George's Happy Hog per hour and select the hickory smoked meat du jour along with a side and soda for $5.The server doubles as the cashier and can take and fill an order in three minutes on average.What is the likelihood that there is no one being served and no one in line at the George's Happy Hog if the times can be assumed as exponentially distributed?
(Multiple Choice)
4.8/5
(71)
A super computer-accessory discount store often has customers who leave the checkout line before being served because of excessive waiting times.The store has a(n):
(Multiple Choice)
4.9/5
(63)
You drive your car into the parking lot of your favorite fast food establishment and get in the line for drive through service.After placing your order into the speaker,you proceed to the first window to pay,and then to the second window to pick up your meal.Since you just studied waiting lines that day in your Operations Management class,you quickly realize as you drive away that this was an example of a ________ channel ________ phase queuing system.
(Essay)
4.7/5
(96)
Customer arrival rates vary throughout the day and the priority rules change depending on the customer mix and influence each has over the finances of the firm.Such a situation is best analyzed using simulation rather than one of the queuing formulas.
(True/False)
4.8/5
(75)