Exam 21: Simulation
Exam 1: Using Operations to Compete107 Questions
Exam 2: Project Management151 Questions
Exam 3: Process Strategy149 Questions
Exam 4: Process Analysis192 Questions
Exam 5: Quality and Performance223 Questions
Exam 6: Capacity Planning133 Questions
Exam 7: Constraint Management160 Questions
Exam 8: Lean Systems179 Questions
Exam 9: Supply Chain Inventory Management216 Questions
Exam 10: Supply Chain Design93 Questions
Exam 11: Supply Chain Location Decisions126 Questions
Exam 12: Supply Chain Integration130 Questions
Exam 13: Supply Chain Sustainability and Humanitarian Logistics77 Questions
Exam 14: Forecasting183 Questions
Exam 15: Operations Planning and Scheduling191 Questions
Exam 16: Resource Planning149 Questions
Exam 17: Decision Making118 Questions
Exam 18: Waiting Line127 Questions
Exam 19: Special Inventory Models53 Questions
Exam 20: Linear Programming84 Questions
Exam 21: Simulation61 Questions
Exam 22: Financial Analysis60 Questions
Exam 23: Acceptance Sampling Plans88 Questions
Exam 24: Measuring Output Rates103 Questions
Exam 25: Learning Curve Analysis56 Questions
Exam 26: Operations Scheduling131 Questions
Select questions type
Simulation requires extensive data gathering before the actual simulation is run.
(True/False)
4.8/5
(83)
When the data needed to set up a simulation are not available,then ________ may be used to collect them.
(Essay)
4.9/5
(80)
Monte Carlo simulation is the use of computer graphics to show customers or products moving through a series of process steps.
(True/False)
4.9/5
(70)
What is the difference between a waiting line model as described in Supplement B and a simulation model of a waiting line problem?
(Essay)
4.8/5
(68)
________ is a feature of simulation models that allows them to obtain operating-characteristic estimates in much less time than is required to gather the same operating data from a real system.
(Essay)
4.8/5
(75)
The following table shows the probability of demand for automobiles used in an Excel simulation.
The "= RAND()" function results in a random number for week #1 of 0.7587.The "= VLOOKUP" function is used with the table above to generate a random car demand for week #1.The resulting random car demand for this week is:
(Multiple Choice)
4.9/5
(82)
Why would data need to be collected prior to conducting a simulation?
(Essay)
4.9/5
(69)
Any random number has the same likelihood of being selected as any other,regardless of how recently it has been selected.
(True/False)
4.8/5
(72)
________ is the act of reproducing the behavior of a system using a model that describes the processes of the system.
(Essay)
4.8/5
(80)
In Excel,the RAND()function generates either a 0 or a 1,purely at random.
(True/False)
5.0/5
(84)
What are the motivations for using simulation for analyzing processes?
(Essay)
4.7/5
(89)
To generate 100 random numbers in an Excel simulation,the "=RAND()" function is first typed into the A1 cell on an Excel spreadsheet.A1 can then be copied and pasted in a rectangular area on the spreadsheet to cover the cells:
(Multiple Choice)
4.7/5
(80)
Scenario E.1
SimQuick is being used to simulate the following bank process:
Customer arrivals at the Entrance Door of the bank with an average time between arrivals of 2.5 minutes.The Line Buffer holds 6 customers.If a customer arrives and the buffer line is filled,the customer leaves.The Work Station Teller's processing time per customer is normally distributed,with a mean of 3.0 minutes and a standard deviation of 0.5 minutes.The Served Customer Buffer in the flow chart is used to count the number of customers processed during the period simulated.A 2-hour period was simulated.
The SimQuick simulation is run,and the results are as follows:
-Use the information in Scenario E.1.Approximately what percentage of total customers who arrived during the 2-hour period found the buffer full and were not able to enter?
(Multiple Choice)
4.9/5
(90)
On occasion,a simulation may yield results that are statistically significant but have little use in a manager's decision making.Such results lack ________.
(Essay)
4.8/5
(88)
A statistically significant difference in simulation results,when acted upon by the manager,will result in significant process improvements in the eyes of the customer or company or both.
(True/False)
4.8/5
(91)
A manager has been given the table shown below and is asked to generate random numbers.Which of the following statements is TRUE? 
(Multiple Choice)
5.0/5
(64)
To generate 80 random numbers in an Excel simulation,the "=RAND()" function is first typed into the C2 cell on an Excel spreadsheet.C2 is then copied and pasted in a rectangular area on the spreadsheet to cover the cells:
(Multiple Choice)
4.8/5
(96)
Showing 21 - 40 of 61
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)