Exam 12: Information Systems Development

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A project team that develops an information system (IS)will comprise business and systems analysts during the requirements definition phase.

Free
(True/False)
4.8/5
(82)
Correct Answer:
Verified

True

Melissa is in charge of creating a Business Process Modeling Notation (BPMN)diagram for the procurement department. The diagram will represent the separate paths to be followed for an old supplier and a new supplier. Which of the following shapes should Melissa use to represent the question "old supplier?" which can be answered with a yes or no as applicable?

Free
(Multiple Choice)
4.7/5
(80)
Correct Answer:
Verified

A

________ set the stage for the requirements for any information systems and applications that need to be created or adapted.

Free
(Multiple Choice)
4.7/5
(80)
Correct Answer:
Verified

D

Crispies is a breakfast cereal manufacturing company. It is shifting its manufacturing process from batch processing to assembly line production. The information system for the assembly line is ready to be installed. Crispies decides to completely shut down the batch processing system and install the new assembly line. This style of conversion is known as ________.

(Multiple Choice)
4.8/5
(71)

In business process management (BPM), an as-is model ________.

(Multiple Choice)
4.8/5
(87)

Which of the following is true of scrum?

(Multiple Choice)
4.9/5
(77)

The ________ is a sequence of activities that determine the earliest date by which a project can be completed.

(Multiple Choice)
4.7/5
(100)

A work breakdown structure (WBS)is a hierarchy of tasks required to complete a project.

(True/False)
4.9/5
(68)

Business processes, information systems, and applications have the same characteristics and components.

(True/False)
4.9/5
(68)

The term ________ refers to a set of management policies, practices, and tools that developers use to maintain control over the systems development life cycle (SDLC)project's resources.

(Multiple Choice)
4.7/5
(76)

Once the as-is model has been documented, that model can then be analyzed for problems or for improvement opportunities.

(True/False)
4.8/5
(91)

In a business process, only a single resource is assigned to a role.

(True/False)
4.9/5
(86)

Once the project's goals and scope have been defined, the next step in the system definition phase of the systems development life cycle (SDLC)is to ________.

(Multiple Choice)
4.7/5
(76)

Which of the following statements is true about the relationship between business processes and information systems?

(Multiple Choice)
5.0/5
(75)

In a Business Process Modeling Notation (BPMN)diagram, dotted arrows depict the flow of ________ in the process.

(Multiple Choice)
4.9/5
(80)

In Business Process Modeling Notation (BPMN)diagrams, a square with a plus sign means that ________.

(Multiple Choice)
4.9/5
(73)

Which of the following can be represented using the Business Process Modeling Notation (BPMN)?

(Multiple Choice)
4.7/5
(74)

In systems development, documents, designs, prototypes, data models, database designs, and working data entry screens are examples of ________.

(Multiple Choice)
4.8/5
(74)

Rapid application development, the unified process, extreme programming, and scrum have led to ________.

(Multiple Choice)
4.7/5
(91)

Which of the following are the dimensions of feasibility?

(Multiple Choice)
4.8/5
(88)
Showing 1 - 20 of 100
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)