Exam 11: Flexible Budgets and Overhead Analysis

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

What is the result of inefficient use of labour?

(Multiple Choice)
4.9/5
(82)

Kelsey, Inc.Kelsey, Inc. produces plastic grocery bags. Kelsey has developed a static budget for the month of August, which is based on 9,000 direct labour hours. During the quarter, the actual activity was 10,000 direct labour hours. Data for August are summarized as follows: Direct labour \ 117,000 \ 120,000 Power (variable cost) 45,000 50,000 Salary of plant superv isor Total -Refer to Kelsey Inc. What is the flexible budget for August?

(Multiple Choice)
5.0/5
(69)

An after-the-fact flexible budget is based the actual level of activity achieved in the period.

(True/False)
4.8/5
(93)

What are the two variances for fixed overhead?

(Multiple Choice)
4.9/5
(77)

Which formula reflects the total fixed overhead variance?

(Multiple Choice)
4.9/5
(74)

Match each of the following terms with their correct description from the items listed below.* Each term may be used more than once, and it is possible that one or more of the classifications may not be used at all. -(Actual hours - standard hours) x SVOR

(Multiple Choice)
4.8/5
(87)

Suppose a company had actual fixed overhead of $60,000, a $1,500 unfavourable spending variance, and a $1,000 unfavourable volume variance. What was the budgeted fixed overhead?

(Multiple Choice)
4.8/5
(77)

Refer to Lifter Company. Assume that the labour market does NOT permit the hiring of part-time forklift operators. What is the salary budget for moving materials?

(Multiple Choice)
4.8/5
(74)

For what level of activity is a static budget prepared?

(Multiple Choice)
4.9/5
(77)

Universal Forklifts, Inc.Universal Forklifts, Inc. produces a specialized machine part used in forklifts. For last year's operations, the following data were gathered: Units produced: 60,000 Direct labour: 30,000 hours (a)\ 9.00 per hour Actual variable overhead: \ 150,000 The company employs a standard costing system. During the year, a variable overhead rate of $4.50 per hour was used. The labour standard requires a half hour per unit produced. -Refer to Universal Forklifts. What is the variable overhead efficiency variances?

(Multiple Choice)
5.0/5
(78)

Discuss the following statement: "Since fixed overhead is, by definition, not related to changes in activity level, then the fixed overhead spending variance is zero."

(Essay)
5.0/5
(88)

Where are the major differences found between activity-based budgeting and traditional budgeting?

(Multiple Choice)
4.8/5
(70)

Which budget allows the determination of expected costs for various levels of activity?

(Multiple Choice)
4.8/5
(86)

Match each of the following terms with their correct description from the items listed below.* Each term may be used more than once, and it is possible that one or more of the classifications may not be used at all. -A budget for a particular level of activity

(Multiple Choice)
4.7/5
(86)

It is reasonable to use average or expected capacity instead of practical capacity to calculate fixed overhead rates.

(True/False)
4.8/5
(86)

Fixed overhead costs are capacity costs that are acquired in advance of usage.

(True/False)
4.8/5
(93)

Define static budget and flexible budget. Briefly explain the use of each of these types of budgets?

(Essay)
4.7/5
(83)

The following standard overhead costs were developed for one of the products of Windrun Company: Variable overhead: 5 hours \times\ 4 per hour 20.00 Fixed overhead: 5 hours \times\ 15 perhour 75.00 Total standard overhead cost per unit \9 5.00 The following information is available regarding the company's operations for the period: Units produced 20,000 Direct labour 115,000 hours Overhead incurred: Variable \ 437,500 Fixed \ 1,320,000 Budgeted fixed overhead for the period is $1,350,000, and the standard fixed overhead rate is based on expected capacity of 90,000 direct labour hours. Required: A. Calculate the variable overhead spending variance and indicate whether it is favourable or unfavourable. B. Calculate the variable overhead efficiency variance and indicate whether it is favourable or unfavourable. C. Calculate the fixed overhead spending variance and indicate whether it is favourable or unfavourable. D. Calculate the fixed overhead volume variance and indicate whether it is favourable or unfavourable.

(Essay)
4.9/5
(83)

Jewel Company Jewel Company calculates its predetermined rates using practical volume, which is 300,000 units. The standard cost system allows two direct labour hours per unit produced. Overhead is applied using direct labour hours. The total budgeted overhead is $3,200,000 of which $900,000 is fixed overhead. The actual results for the year are as follows: Units produced: 280,000 Direct labour: 570,000 hours @\ 9 per hour Variable overhead: \ 2,320,000 Fixed overhead: \ 872,000 -Refer to Jewel Company. What is the predetermined fixed overhead rate?

(Multiple Choice)
4.8/5
(83)

Budgets are often used as benchmarks for performance evaluation.

(True/False)
4.9/5
(89)
Showing 61 - 80 of 147