Exam 4: Job-Order Costing Systems
Exam 1: A: Basic Cost Management Concepts239 Questions
Exam 1: B: Basic Cost Management Concepts32 Questions
Exam 2: Cost Behaviour122 Questions
Exam 3: Cost-Volume-Profit Analysis107 Questions
Exam 4: Job-Order Costing Systems102 Questions
Exam 5: Process Costing132 Questions
Exam 6: Activity-Based Costing164 Questions
Exam 7: Allocating Costs of Support Departments and Joint Products137 Questions
Exam 8: Budgeting for Planning and Control154 Questions
Exam 9: Standard Costing: a Functional-Based Control Approach86 Questions
Exam 10: Responsibility Accounting,performance Evaluation,and Transfer Pricing110 Questions
Exam 11: Tactical Decision Making100 Questions
Exam 12: Pricing and Profitability Analysis102 Questions
Exam 13: Strategic Cost Management120 Questions
Exam 14: Activity-Based Management116 Questions
Exam 15: The Balanced Scorecard: Strategic-Based Control94 Questions
Exam 16: Quality and Environmental Cost Management157 Questions
Exam 17: Lean Accounting and Productivity Measurement138 Questions
Exam 18: Inventory Management: Economic Order Quantity,jit,and the Theory of Constraints97 Questions
Select questions type
The following information is available pertaining to the Production Division:
Mixing Dept. Finishing Dept. Total Overhead costs \ 7,500 \ 22,500 \ 30,000 Direct labour hours 7,500 2,500 10,000 Machine hours 2,500 7,500 10,000
Mixing Dept. Finishing Dept. Total Prime costs \ 1,250 \ 0 \ 1,250 Direct labour hours 250 0 250 Machine hours 1 0 1 Units produced 500 0 500
-Refer to the figure.Departmental overhead notes for the Mixing Department are based on direct labour hours,while departmental overhead rates for the Finishing Department are based on machine hours.Based on departmental overhead rates,what is the cost of Job 4X5?
(Multiple Choice)
5.0/5
(95)
Which of the following transactions in a job-order costing system requires the procedure of merely moving a job-order cost sheet from one file to another?
(Multiple Choice)
4.7/5
(86)
What is the most important factor that causes service firms to generally rank lower in customer satisfaction than manufacturing firms?
(Essay)
4.8/5
(84)
What is the term for the maximum output that can be realized if everything operates efficiently?
(Multiple Choice)
4.7/5
(79)
The King Corporation manufactures custom-made furniture. The following data pertains to Job X4A:
Direct materals placed into production \ 9,000 Direct labour hours warked 300 hours Direct labou rate per hour \ 15 Machine hours worked 100 hours
Factory overhead rate is $22.50 per machine hour.Job X4A consists of 500 units.
-Refer to the figure.One-half of Job X4A was sold for $10,000.What is the total amount of costs assigned to Job X4A?
(Multiple Choice)
4.8/5
(89)
What information will be found on a materials requisition form?
(Multiple Choice)
4.8/5
(73)
Which of the following firms would make extensive use of service costing?
(Multiple Choice)
4.8/5
(94)
Alpha Company manufactures customized motors on a job-order basis. Job 492 is an order for 100 units. It requires the following:
After inspection, 2 units required rework, comprising 8 additional direct labour hours and $60 of materials.
-Refer to the figure.If the rework is considered abnormal spoilage,what is the cost of job 492?
(Multiple Choice)
4.7/5
(74)
What is the flow of costs through the system in a traditional enterprise?
(Multiple Choice)
4.8/5
(80)
In a job-order costing system,if costs are incurred to rework a job due to inadequate training of personnel,what would be the journal entry for these costs?
(Multiple Choice)
4.8/5
(90)
The Kraig Corporation manufactures custom-made purses. The following data pertains to Job XY5:
Factory overhead is applied using a plant-wide rate based on direct labour hours.
Direct materials placed into production \ 4,000 Direct labour hours worked 50 hours Direct labour rate per hour \ 15 Machine hours worked 100 hours
Factory overhead was budgeted at $60,000 for the year and the direct labour hours were estimated to be 15,000. Job XY5 consists of 50 units.
-Refer to the figure.What the total cost assigned to Job XY5?
(Multiple Choice)
4.8/5
(83)
The Kraig Corporation manufactures custom-made purses. The following data pertains to Job XY5:
Factory overhead is applied using a plant-wide rate based on direct labour hours.
Direct materials placed into production \ 4,000 Direct labour hours worked 50 hours Direct labour rate per hour \ 15 Machine hours worked 100 hours
Factory overhead was budgeted at $60,000 for the year and the direct labour hours were estimated to be 15,000. Job XY5 consists of 50 units.
-Refer to the figure.What is the materials cost per unit for Job XY5?
(Multiple Choice)
4.8/5
(90)
What are the three inventory accounts on a balance sheet for a manufacturer?
(Multiple Choice)
4.8/5
(75)
Unit costs are critical information for what type of financial reporting?
(Multiple Choice)
4.9/5
(80)
The following information is available pertaining to the Production Division:
Mixing Dept. Finishing Dept. Total Overhead costs \ 7,500 \ 22,500 \ 30,000 Direct labour hours 7,500 2,500 10,000 Machine hours 2,500 7,500 10,000
Mixing Dept. Finishing Dept. Total Prime costs \ 1,250 \ 0 \ 1,250 Direct labour hours 250 0 250 Machine hours 1 0 1 Units produced 500 0 500
-Refer to the figure.What is the overhead rate for the Finishing Department based on machine hours?
(Multiple Choice)
4.9/5
(76)
What source document is used to assign direct labour costs to individual jobs?
(Multiple Choice)
4.9/5
(88)
Griswold Corporation is a job-order costing company that uses activity-based costing to apply overhead to jobs. The following overhead activities were budgeted for the year.
Activity Cost Driver Amount of driver Setups \ 240,000 number of setups 6,000 Purchasing 160,000 number of parts 20,000 Other overhead 300,000 direct labour hours 80,000
The following information about the jobs was given for September. Job 101 Job 102 Job 103 Job 104 Balance 9/1 \ 64,900 \ 40,770 \ 30,500 0 Direct materials 54,000 37,900 25,000 11,000 Direct labour 80,000 38,500 43,000 21,000 Number of setups 40 10 30 200 Number of parts 300 80 400 500 Direct labour hours 5,000 2,400 5,200 1,200
By September 30, Jobs 102 and 103 were completed and sold. The remaining jobs were still in process.
-Refer to the figure.The ending work in process would consist of the costs of what jobs?
(Multiple Choice)
4.9/5
(73)
Which of the following costing system assigns actual costs of materials to inventory?
(Multiple Choice)
4.9/5
(68)
Showing 81 - 100 of 102