Exam 25: Extension 14: Maintenance
Exam 1: Introduction to Operations Management70 Questions
Exam 2: Competitiveness, Strategy, and Productivity73 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design77 Questions
Exam 5: Strategic Capacity Planning for Products and Services103 Questions
Exam 6: Process Selection and Facility Layout151 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 11: Aggregate Planning and Master Scheduling81 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management162 Questions
Exam 14: Jit and Lean Operations88 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming105 Questions
Exam 20: Extension 4: Reliability10 Questions
Exam 21: Extension 5: Decision Theory126 Questions
Exam 22: Extension 7: Learning Curves68 Questions
Exam 23: Extension 8: The Transportation Model20 Questions
Exam 24: Extension 10: Acceptance Sampling65 Questions
Exam 25: Extension 14: Maintenance38 Questions
Select questions type
In the broadest sense, equipment and facilities preventive maintenance extends back to the:
(Multiple Choice)
4.8/5
(76)
If one operator performing preventive maintenance requires two hours to complete the job, then two operators working together should complete the preventive maintenance in one hour.
(True/False)
4.8/5
(83)
In the area of maintenance, the Pareto phenomenon is reflected in the fact that, regardless of problem classification, all equipment will justify about the same expense.
(True/False)
4.9/5
(77)
Breakdown maintenance is _____________; preventative maintenance is _________.
(Multiple Choice)
4.8/5
(73)
In the broadest sense, preventive maintenance extends back to the installation stage of equipment and facilities.
(True/False)
4.9/5
(81)
It is best to replace a failing piece of equipment with one that will have identical capabilities as the equipment being replaced since we are already familiar with that machine.
(True/False)
4.9/5
(93)
Cutting preventive maintenance in half will probably double the number of breakdowns.
(True/False)
4.9/5
(74)
The total maintenance curve (preventive maintenance cost plus breakdown and repair cost):
(Multiple Choice)
4.7/5
(90)
The goal of maintenance is to maintain the productive system in good working order while minimizing:
(Multiple Choice)
4.7/5
(79)
Breakdown programs often are prioritized such that some equipment gets a lot of attention and others get very little.This typically reflects the fact that breakdowns are consistent with __________.
(Multiple Choice)
4.9/5
(82)
___________ is most closely associated with breakdown maintenance.
(Multiple Choice)
4.8/5
(83)
Ideally, preventive maintenance will be performed before a breakdown or failure.
(True/False)
4.7/5
(72)
The average time before breakdown of a machine is normally distributed and has a mean of 7 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $2,500 and preventive maintenance costs $500, what is the optimal preventive maintenance interval?
(Essay)
4.8/5
(92)
Pareto analysis (using the 80/20 rule) is one method of determining when preventive maintenance activities should be performed.
(True/False)
5.0/5
(92)
Showing 21 - 38 of 38