Exam 25: Extension 14: Maintenance

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

In the broadest sense, equipment and facilities preventive maintenance extends back to the:

(Multiple Choice)
4.8/5
(76)

If one operator performing preventive maintenance requires two hours to complete the job, then two operators working together should complete the preventive maintenance in one hour.

(True/False)
4.8/5
(83)

In the area of maintenance, the Pareto phenomenon is reflected in the fact that, regardless of problem classification, all equipment will justify about the same expense.

(True/False)
4.9/5
(77)

Reactive maintenance is _____________ maintenance.

(Multiple Choice)
4.8/5
(87)

The goal of maintenance is to minimize cost.

(True/False)
4.8/5
(78)

The type of maintenance which is periodic in nature is:

(Multiple Choice)
4.8/5
(83)

Breakdown maintenance is _____________; preventative maintenance is _________.

(Multiple Choice)
4.8/5
(73)

In the broadest sense, preventive maintenance extends back to the installation stage of equipment and facilities.

(True/False)
4.9/5
(81)

It is best to replace a failing piece of equipment with one that will have identical capabilities as the equipment being replaced since we are already familiar with that machine.

(True/False)
4.9/5
(93)

Cutting preventive maintenance in half will probably double the number of breakdowns.

(True/False)
4.9/5
(74)

The total maintenance curve (preventive maintenance cost plus breakdown and repair cost):

(Multiple Choice)
4.7/5
(90)

The goal of maintenance is to maintain the productive system in good working order while minimizing:

(Multiple Choice)
4.7/5
(79)

Breakdown programs often are prioritized such that some equipment gets a lot of attention and others get very little.This typically reflects the fact that breakdowns are consistent with __________.

(Multiple Choice)
4.9/5
(82)

"Total productive maintenance" is best described as:

(Multiple Choice)
4.8/5
(67)

___________ is most closely associated with breakdown maintenance.

(Multiple Choice)
4.8/5
(83)

Ideally, preventive maintenance will be performed before a breakdown or failure.

(True/False)
4.7/5
(72)

The average time before breakdown of a machine is normally distributed and has a mean of 7 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $2,500 and preventive maintenance costs $500, what is the optimal preventive maintenance interval?

(Essay)
4.8/5
(92)

Pareto analysis (using the 80/20 rule) is one method of determining when preventive maintenance activities should be performed.

(True/False)
5.0/5
(92)
Showing 21 - 38 of 38