Exam 4: Job Costing

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Operation costing uses which of the following costing systems? Operation costing uses which of the following costing systems?

(Multiple Choice)
4.7/5
(90)

Jackson Inc. listed the following data for 2019: Budgeted factory overhead \ 1,271,000 Budgeted direct labor hours 82,000 Budgeted machine hours 41,000 Actual factory overhead 1,201,000 Actual direct labor hours 86,300 Actual machine hours 39,400 Assuming Jackson Inc.applied overhead based on direct labor hours, the firm's predetermined overhead rate for 2019 is:(round calculations to 2 significant digits):

(Multiple Choice)
4.7/5
(83)

Product costing provides useful cost information for all the following except:

(Multiple Choice)
4.7/5
(80)

The time ticket shows which amount for an employee?

(Multiple Choice)
4.9/5
(84)

The following information is for Stier Company for the month of November: a.Factory overhead costs are applied to jobs at the predetermined rate of $80 per labor-hour.Job X-14 incurred 2,300 labor-hours; Job SM-4 used 1,850 labor-hours. b.Job X-14 was shipped to customers during November. The company closed the overapplied or underapplied overhead to the Cost of Goods Sold account at the end of November c.Factory utilities, factory depreciation, and factory insurance incurred is summarized by these factory vouchers, invoices, and cost memos: Utilities \ 44,500 Depreciation 53,500 Insurance 38,600 d.The Company purchased the following direct materials and indirect materials: Material A \ 6,000 Material B 7,000 Indirect materials 4,250 Total \ 17,250 e.Direct materials and indirect materials used are as follows: Job X-14 Job SM-4 Total Material A \ 5,450 \ 33,000 \ 38,450 Material B 1,650 25,500 27,150 Subtotal \7 ,100 \5 8,500 \6 5,600 Indirect materials 66,500 Total \1 32,100 f.Factory labor incurred for the two jobs and indirect labor is as follows: Job X-14 \ 32,200 Job SM-4 25,900 Indirect labor Total Required: 1.Calculate the amount of overapplied or underapplied overhead and state whether the cost of goods sold account will be increased or decreased by the adjustment. 2.Calculate the total manufacturing cost for Job X-14 and Job SM-4 for November.

(Essay)
4.9/5
(81)

ABC Company listed the following data for the current year: Budgeted factory overhead \ 1,044,000 Budgeted direct labor hours 69,600 Budgeted machine hours 24,000 Actual factory overhead 1,037,400 Actual labor hours 72,600 Actual machine hours 23,600 Assuming ABC Company applied overhead based on direct labor hours, the company's predetermined overhead rate for the year is:

(Multiple Choice)
4.8/5
(83)

Randall Company manufactures products to customer specifications. A job costing system is used to accumulate production costs. Factory overhead cost was applied at 125% of direct labor cost. Selected data concerning the past year's operation of the company are presented below. January 1 December 31 Direct materials \ 77,000 \ 40,000 Work in process 66,000 42,000 Finished goods 115,000 100,000 Other information Direct materials purchases \ 324,000 Cost of goods available for sale 950,000 Actual factory overhead costs 260,000 The cost of direct materials used for production is:

(Multiple Choice)
4.8/5
(75)

Dye Co.uses a job cost system and predetermines a factory overhead rate based on the amount of expected fixed costs and expected volume.At the conclusion of the fiscal year, overapplied overhead could be explained by which of the following? Dye Co.uses a job cost system and predetermines a factory overhead rate based on the amount of expected fixed costs and expected volume.At the conclusion of the fiscal year, overapplied overhead could be explained by which of the following?

(Multiple Choice)
4.8/5
(83)

Which one of the following is the amount of factory overhead applied that exceeds the actual factory overhead cost?

(Multiple Choice)
4.9/5
(84)

Jackson Inc. listed the following data for 2019: Budgeted factory overhead \ 1,271,000 Budgeted direct labor hours 82,000 Budgeted machine hours 41,000 Actual factory overhead 1,201,000 Actual direct labor hours 86,300 Actual machine hours 39,400 If overhead is applied based on machine hours, the overapplied/underapplied overhead is:

(Multiple Choice)
4.9/5
(64)

Beckner Inc. is a job-order manufacturer. The company uses a predetermined overhead rate based on direct labor hours to apply overhead to individual jobs. For the current year, estimated direct labor hours are 133,000 and estimated factory overhead is $784,700. The following information is for September. Job X was completed during September, while Job Y was started but not finished. September 1, inventories: Materials \2 4,000 Work-in-process (All Job X) 53,400 Finished goods 105,600 Materials purchases \1 57,000 Direct materials requisitioned: Job X \5 74,000 Job Y 68,000 Direct labor hours: Job X 7,000 Job Y 5,500 Labor costs incurred: Direct labor ( \ 6.00 per hour) \7 5,000 Indirect labor 24,200 Factory supervisory salaries 11,100 Rental costs: Factory \9 ,300 Administrative offices 3,200 Total equipment depreciation costs: Factory \ 10,400 Administrative offices 2,800 Indirect materials used \ 17,800 The total factory overhead applied during September is:

(Multiple Choice)
4.9/5
(63)

The three major differences between process and job order costing systems are those relating to:

(Multiple Choice)
4.9/5
(74)

A time ticket:

(Multiple Choice)
4.9/5
(77)

Maple Mount Fishery is a canning company in Astoria. The company uses a normal costing system in which factory overhead is applied on the basis of direct labor costs. Budgeted factory overhead for the year was $680,400, and management budgeted $324,000 of direct labor costs. During the year, the company incurred the following actual costs. Direct materials used \ 384,000 Direct labor 306,000 Factory overhead 658,000  The January 1 balances of inventory accounts are shown below. \text { The January } 1 \text { balances of inventory accounts are shown below. } Materials-all direct \ 70,000 Work-in-process 41,000 Finished goods 26,000 The December 31 balances of these inventory accounts were ten percent lower than the balances at the beginning of the year. The cost of goods manufactured during the year is:(Round your intermediate calculations to 1 decimal place.)

(Multiple Choice)
4.8/5
(71)

The primary focus of job costing in service industries is on:

(Multiple Choice)
4.9/5
(75)

Sutherland Company listed the following data for 2019: Budgeted factory overhead \ 2,100,000 Budgeted direct labor hours 89,000 Budgeted machine hours 51,000 Actual factory overhead 2,201,000 Actual direct labor hours 83,700 Actual machine hours 48,900 Assuming Sutherland applied overhead based on direct labor hours, the company's predetermined overhead rate for 2019 is (round to two significant digits):

(Multiple Choice)
4.9/5
(78)

Warren Company uses a predetermined overhead rate. Overhead for the next twelve months is estimated to be $480,000. Jackson applies overhead as a percentage of direct labor cost. Direct labor costs are estimated to be $400,000 for the next year. During the year actual direct labor costs amounted to $520,000 and the actual overhead was $605,000. Required: (1) Calculate the over/under-applied overhead for the year. (2) Prepare the journal entries to close the accounts, assuming that the over/under-applied overhead is closed to cost of goods sold.

(Essay)
5.0/5
(88)

Departmental overhead rates are preferred over plantwide rates when

(Multiple Choice)
4.7/5
(74)

When completed units are sold:

(Multiple Choice)
4.8/5
(68)

The system where the cost of a product or service is obtained by assigning costs to masses of similar units in each department and then computing unit cost on an average basis is called

(Multiple Choice)
4.7/5
(73)
Showing 81 - 100 of 118
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)