Exam 12: Resource Management
Exam 1: Introduction: Why Project Management105 Questions
Exam 2: The Organizational Context: Strategy, Structure, and Culture105 Questions
Exam 3: Project Selection and Portfolio Management103 Questions
Exam 4: Leadership and the Project Manager112 Questions
Exam 5: Scope Management111 Questions
Exam 6: Project Team Building, Conflict, and Negotiation102 Questions
Exam 7: Risk Management102 Questions
Exam 8: Cost Estimation and Budgeting105 Questions
Exam 9: Project Scheduling: Networks, Duration Estimation, and Critical Path105 Questions
Exam 10: Project Scheduling: Lagging, Crashing, and Activity Networks96 Questions
Exam 11: Advanced Topics in Planning and Scheduling: Agile and Critical Chain105 Questions
Exam 12: Resource Management98 Questions
Exam 13: Project Evaluation and Control107 Questions
Exam 14: Project Closeout and Termination101 Questions
Select questions type
The BEST method for establishing the existence of resource conflicts across project activities uses:
(Multiple Choice)
4.8/5
(82)
The problem of resource underutilization that a project manager faces when managing a single project disappears in the multiproject environment.
(True/False)
4.8/5
(82)
A resource loading table is created through identifying the project activities and the resources required for completion and applying this information to the project schedule baseline.
(True/False)
4.9/5
(73)
There is,for almost all projects,usually a dominant constraint that serves as the final arbiter of project decisions.
(True/False)
4.8/5
(70)
The amounts of individual resources that a schedule requires during specific time periods is referred to as the resource's:
(Multiple Choice)
4.8/5
(74)
A project consists of eleven activities (all times are given in days)and has worker requirements as indicated in the table.Assume that all four workers employed by this organization are generalists and are able to work on any of the tasks.What is the first day where this project exceeds the four worker maximum? Activity Activity time Workers Needed Predecessor A 10 1 B 4 2 C 7 3 A 4 1 A E 8 2 F 9 3 C,E G 13 1 H 14 2 E, G J 13 3 10 1 , 5 2
(Multiple Choice)
4.8/5
(79)
What is mathematical programming,how can it be applied to resource decisions,and what are the advantages and disadvantages of doing so?
(Essay)
4.9/5
(71)
Create a resource loading chart for the project described by this table and then adjust activities by splitting them or delaying them in order to meet the resource constraints of 8 hours of work per day.Show your new resource loading chart,indicating which activities have been adjusted.What is the change in project completion dates?
Resource Activity Time Predecessor Time/Day Resource 5 - 5 1 2 - 3 1,2 4 2 2 3 5 3 5 4 1,3 4 7 3 4 3 2,3 2 6 2
(Essay)
4.8/5
(79)
The horizontal axis of a resource loading chart is in units of:
(Multiple Choice)
4.9/5
(85)
In general,when constructing a resource loading chart,one should avoid:
(Multiple Choice)
4.8/5
(86)
A project consists of six activities (all times are given in days).Provide the range of days during which resource usage is highest and the range of days during which resource usage is lowest using a late start schedule.
Activity Duration (days) Activity Cost Predecessor 10 140 8 64 , 12 96 6 120 14 168 12 144
(Essay)
4.8/5
(79)
This resource loading table shows the requirements for a five-task project that has a 42-day duration.The table is designed to reflect an early start schedule.Activity D has only one predecessor and activities C and E have two each.What differences exist between this table and the late start resource table?
Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 10 10 10 10 10 10 10 10 10 10 7 7 7 7 7 7 7 7 7 7 7 7 15 15 15 15 15 15 15 15 11 11 11 11 11 11 11 11 11 E Period Total 17 17 17 17 17 17 17 17 17 17 7 7 26 26 26 26 26 26 26 26 11 Cumulative 17 34 51 68 85 102 119 136 153 170 177 184 10 236 262 288 314 340 366 392 403
Period 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 B D 11 11 11 11 11 E 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 Period Total 11 11 11 11 11 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 Cumulative 414 425 436 447 458 474 490 506 522 538 554 570 586 602 618 634 650 666 682 698 714
(Essay)
4.9/5
(82)
-Use this resource load chart to determine which activity uses the fewest resources.
(Multiple Choice)
4.9/5
(76)
The idea behind resource leveling is to avoid huge swings in utilization of labor and equipment.
(True/False)
5.0/5
(84)
Use the project described in the table to determine the total resources required for this project during week 1 if a worker is expected to devote half-time (four hours per day)to this project.Assume that the project work is conducted on a 5-day-per-week basis. Activity Duration Predecessor A 5 days - B 4 days A C 5 days A 6 days B E 6 days C,D F 6 days E
(Multiple Choice)
4.8/5
(66)
The One Shovel Construction Company is hired by the City of Edmond to lay sewer pipe from the east end of town to the west end of town using their single shovel to dig the trench.While the crew would like to begin at both ends simultaneously and have a dramatic ceremony when both ends meet,they find themselves with a bit of a:
(Multiple Choice)
4.7/5
(76)
-The resource usage table tells us the project team members,their assigned tasks,and the time each task is expected to take.
(True/False)
4.8/5
(74)
The process that addresses the complex challenges of project constraints is known as:
(Multiple Choice)
4.8/5
(89)
Use the information in the table and assume that a worker is expected to devote half-time (four hours per day)to this project with work taking place on a 5-day-per-week basis.Which week has the highest resource usage? Activity Duration Predecessor A 5 days - B 4 days A C 5 days A 6 days B E 6 days C,D F 6 days E
(Multiple Choice)
4.9/5
(82)
Showing 41 - 60 of 98
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)