Exam 17: MRP and ERP
Exam 1: Introduction to Operations Management74 Questions
Exam 2: Competitiveness70 Questions
Exam 3: Forecasting139 Questions
Exam 4: Product and Service Design78 Questions
Exam 4: RELIABILITY – Static12 Questions
Exam 6: Strategic Capacity Planning for Products and Services85 Questions
Exam 7: Decision Theory– Static114 Questions
Exam 8: Process Selection and Facility Layout132 Questions
Exam 9: Work Design and Measurement129 Questions
Exam 10: learning curve– Static61 Questions
Exam 11: Location Planning and Analysis62 Questions
Exam 12: The Transportation Model– Static20 Questions
Exam 13: Management of Quality97 Questions
Exam 14: Quality Control112 Questions
Exam 15: Acceptance Sampling– Static51 Questions
Exam 16: Aggregate Planning and Master Scheduling74 Questions
Exam 17: MRP and ERP81 Questions
Exam 18: Inventory Management128 Questions
Exam 19: JIT and Lean Operations79 Questions
Exam 20: Maintenance– Static36 Questions
Exam 21: Supply Chain Management87 Questions
Exam 22: Scheduling98 Questions
Exam 23: Project Management113 Questions
Exam 24: Management of Waiting Lines64 Questions
Exam 25: Linear Programming93 Questions
Select questions type
The MRP input listing the assemblies, subassemblies, parts, and raw materials needed to produce one unit of finished product is the:
(Multiple Choice)
4.9/5
(70)
The MRP input stating which end items are to be produced, when they are needed, and what quantities are needed, is the:
(Multiple Choice)
4.8/5
(69)
In MRP, the gross requirements of a given component part are calculated directly from:
(Multiple Choice)
4.9/5
(67)
A visual depiction of the subassemblies and components that are needed to produce and/or assemble a product is called a(n):
(Multiple Choice)
5.0/5
(67)
The master schedule needs to be for a period long enough to cover the stacked or cumulative lead time necessary to produce the end items.
(True/False)
4.9/5
(66)
Safety time is sometimes used in MRP rather than safety stock quantities.
(True/False)
4.9/5
(63)
An assembly-time chart indicates gross and net requirements taking into account the current available inventory.
(True/False)
4.9/5
(77)
Refer to this product tree:
If 17 Ps are needed, and no on-hand inventory exists for any items, how many Cs will be needed?
(Multiple Choice)
4.8/5
(64)
The _________ of ERP makes it valuable as a strategic planning tool.
(Multiple Choice)
4.8/5
(85)
Lot-for-lot ordering in MRP provides coverage for some predetermined number of periods (such as two or three) that extend beyond the orders already received for those periods.
(True/False)
4.7/5
(80)
Net requirements for component J are as follows: 60 units in week 2, 40 units in week 3, and 60 units in week 5. If a fixed-period, two-period lot-sizing method is used, what will be the quantity of the first planned receipt?
(Multiple Choice)
4.9/5
(71)
Refer to this product tree:
If 17 Ps are needed, and on-hand inventory consists of 10 As, 15 Bs, 20 Cs, 12 Ms, and 5 Ns, how many Cs are needed?
(Multiple Choice)
4.9/5
(74)
In a master schedule, the planning horizon is often separated into a series of time periods called:
(Multiple Choice)
4.7/5
(72)
Which of these items would be most likely to have dependent demand?
(Multiple Choice)
4.9/5
(73)
Which one of the following most closely describes the MRP approach that is used for components or subassemblies to compensate for variations in lead time?
(Multiple Choice)
4.9/5
(79)
Capacity requirements planning helps managers reconcile __________ with __________.
(Multiple Choice)
4.8/5
(73)
MRP output reports are divided into two main groups, daily and weekly.
(True/False)
4.8/5
(78)
Which of the following represents an attempt to balance the benefits of stability in the production plan against the benefits of responding quickly to new orders?
(Multiple Choice)
4.9/5
(93)
Showing 61 - 80 of 81
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)