If G is gauge is metres, V is speed of trains in km/hour and R is radius of a curve in metres, the equilibrium super elevation is
(Multiple Choice)
4.9/5
(75)
Minimum packing space provided between two sleepers, is between
(Multiple Choice)
4.8/5
(81)
The reception signal is
(i. Outer signal
(ii. Home signal
(iii) Starter
(iv. Advanced starter
The correct answer is
(Multiple Choice)
4.8/5
(93)
The standard width of ballast for B.G. Track in Indian Railways, is kept
(Multiple Choice)
4.8/5
(77)
The quantity of stone ballast required per metre tangent length, is
(Multiple Choice)
4.9/5
(82)
Minimum composite sleeper index for wooden sleepers used over bridge girders, is
(Multiple Choice)
4.7/5
(67)
Maximum wheel base distance provided on Indian B.G. tracks, is
(Multiple Choice)
4.9/5
(90)
The nominal size of ballast used for points and crossings is
(Multiple Choice)
4.8/5
(82)
Switch angle depends on
(i. Heel divergence
(ii. Length of tongue rail
(iii) Flange-way clearance
(iv. Throw of switch
The correct answer is
(Multiple Choice)
4.8/5
(79)
The steepest gradient permissible on a 2.5° curve for Broad Gauge line having ruling gradient of 1 in 200 is
(Multiple Choice)
4.8/5
(89)
When the rail ends rest on a joint sleeper, the joint is termed as
(Multiple Choice)
4.7/5
(70)
In a railway track, permissible gauge with tolerance under loaded condition, is
(Multiple Choice)
4.9/5
(75)