Exam 5: Railway Track and Infrastructure Maintenance

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The slipping of driving wheels of locomotives on the rail surface causes

Free
(Multiple Choice)
5.0/5
(86)
Correct Answer:
Verified

A

The overall length of a turn out is the distance between the end of stock rail and

Free
(Multiple Choice)
5.0/5
(81)
Correct Answer:
Verified

A

For points and crossings, maximum size of ballast, is

Free
(Multiple Choice)
4.9/5
(74)
Correct Answer:
Verified

D

The tread of wheels is provided an outward slope of

(Multiple Choice)
4.8/5
(51)

If the standard length of a crossing is 480 cm, the number of crossing is

(Multiple Choice)
4.9/5
(73)

The cross-sectional area of 52 kg flat footed rail is

(Multiple Choice)
4.9/5
(75)

For calculating the length of curve lead (C.L.), the correct formula is

(Multiple Choice)
4.9/5
(73)

On Indian Railways standard length of rails for M.G. track, is

(Multiple Choice)
4.9/5
(73)

Best wood for wooden sleepers is

(Multiple Choice)
4.9/5
(90)

Weight and cross section of the rails are decided on

(Multiple Choice)
4.8/5
(77)

Width of the top portion of a flat footed, rail, is

(Multiple Choice)
4.9/5
(71)

To prevent percolation of water into formation, moorum is used as a blanket for

(Multiple Choice)
4.8/5
(82)

Which of the following methods of designation of crossing is mostly used in India?

(Multiple Choice)
4.9/5
(82)

The type of bearing plate used in all joints and on curves to give better bearing area to the rails is

(Multiple Choice)
4.8/5
(78)

Maximum cant deficiency prescribed on Indian Board Gauge Railways, is

(Multiple Choice)
4.9/5
(101)

Number of fish bolts per fish plate is

(Multiple Choice)
4.9/5
(78)

The height of the center of arm of a semaphore signal above the ground is

(Multiple Choice)
4.9/5
(81)

Cast iron sleeper, is

(Multiple Choice)
4.7/5
(82)

Bull headed rails are generally provided on

(Multiple Choice)
4.8/5
(87)

Coal ash (or cinder) is used in initial stages of a new construction of railway for

(Multiple Choice)
4.9/5
(68)
Showing 1 - 20 of 77
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)