Exam 3: Railway Track Design and Maintenance

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Rail tops of a track are placed

(Multiple Choice)
4.7/5
(76)

Tensile strength of steel used in rails should not be less than

(Multiple Choice)
4.7/5
(91)

If D is distance between centres of two parallel track of gauge G, then, total length of cross-over (from the point of commencement to the point of termination) with an intermediate straight portion and N crossing, is given by

(Multiple Choice)
5.0/5
(73)

A train is hauled by 2-8-2 locomotive with 22.5 tonnes and on each driving axle. Assuming the coefficient of rail-wheel friction to be 0.25, what would be the hauling capacity of the locomotive?

(Multiple Choice)
4.9/5
(76)

The total gap on both sides between the inside edges of wheel flanges and gauge faces of the rail is kept as

(Multiple Choice)
4.9/5
(75)

Heel divergency, the distance between the running faces of stock rail and gauge face of tongue rail, as recommended for Indian B.G. tracks, is

(Multiple Choice)
4.8/5
(81)

On B.G. tracks the distance of outer signal from station limit is kept

(Multiple Choice)
4.9/5
(79)

If 'A' is the angle formed by two gauge faces, the crossing number will be

(Multiple Choice)
4.8/5
(94)

To achieve best performance, the type of switch preferred to, is

(Multiple Choice)
4.8/5
(88)

A Broad Gauge branch line takes off as a contrary flexure from a main line. If the superelevation required for branch line is 10 mm and cant deficiency is 75 mm, the super-elevation to be actually provided on the branch line will be

(Multiple Choice)
4.9/5
(95)

Largest percentage of material in the rail is in its

(Multiple Choice)
4.9/5
(79)

30 m long rails are used in

(Multiple Choice)
4.8/5
(87)

To prevent creep in rails, the steel sleepers are fixed with rails by clips, bolts and

(Multiple Choice)
4.7/5
(88)

52 kg rails are mostly used in

(Multiple Choice)
4.8/5
(79)

In a scissors crossover, the crossings provided are (i. 2 obtuse angle crossings (ii. 4 obtuse angle crossings (iii) 4 acute angle crossings (iv. 6 acute angle crossings The correct answer is

(Multiple Choice)
4.8/5
(65)

The side slope of embankments for a railway track is generally taken as

(Multiple Choice)
4.8/5
(80)

The check rails are placed opposite the crossing so that

(Multiple Choice)
4.7/5
(77)

Overall depth of a dog spike, is

(Multiple Choice)
4.7/5
(95)

Wing rails are provided

(Multiple Choice)
4.9/5
(65)

Distance between the inner rail and check rail provided on sharp curve, is

(Multiple Choice)
4.9/5
(79)
Showing 21 - 40 of 50
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)