Exam 2: Railway Track Components and Measurements

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

On Indian Railways, the approximate weight of a rail section is determined from the formula

(Multiple Choice)
4.8/5
(80)

To design a cross-over between parallel tracks, the required components are:

(Multiple Choice)
4.7/5
(79)

The sleepers resting directly on girder are fastened to the top flange of girder by

(Multiple Choice)
4.8/5
(67)

Continuity of electric current across welded rail joints, is maintained by

(Multiple Choice)
4.7/5
(81)

A CST-9 sleeper consists of

(Multiple Choice)
4.8/5
(93)

If a is average number of peaks more than 10 mm of unevenness per kilometre, b is average number peaks more than 6 mm for gauge variation per kilometre and c is average number of peaks more than 2 mm twist per metre, then composite current recording index (Ic), as recommended by Indian Northern Railways, is

(Multiple Choice)
4.9/5
(64)

Bending of rail ends due to loose packing under a joint and loose fish Bolts, is known

(Multiple Choice)
4.9/5
(81)

Fish plate is in contact with rail at

(Multiple Choice)
4.9/5
(84)

In railways a triangle is mainly provided for

(Multiple Choice)
4.8/5
(84)

At a rail joint, the ends of adjoining rails, are connected with a pair of fish plates and

(Multiple Choice)
4.7/5
(77)
Showing 41 - 50 of 50
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)