Exam 3: Measurement and Estimation in Construction
Exam 1: Construction and Measurement25 Questions
Exam 2: Mecasurement and Estimation in Construction Work25 Questions
Exam 3: Measurement and Estimation in Construction23 Questions
Exam 4: Measurement and Specification for Construction and Engineering8 Questions
Select questions type
The damp proof course (D.P.C.) is measured in
Free
(Multiple Choice)
4.8/5
(81)
Correct Answer:
B
The brick work is measured in sq metre, in case of
Free
(Multiple Choice)
4.9/5
(94)
Correct Answer:
D
The measurement is made for stone work in square metre in case of
Free
(Multiple Choice)
4.9/5
(65)
Correct Answer:
D
Pick up the item whose weight is added to the weight of respective item, is
(Multiple Choice)
4.9/5
(80)
The height of the sink of wash basin above floor level is kept
(Multiple Choice)
4.9/5
(83)
Pick up the incorrect statement regarding a master trap from the following:
(Multiple Choice)
4.8/5
(83)
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
(Multiple Choice)
5.0/5
(95)
The 'centre line method' is specially adopted for estimating
(Multiple Choice)
4.8/5
(81)
The expected out turn for earth work in excavation in ordinary soil per workman per day is
(Multiple Choice)
4.9/5
(76)
Pick up the item of work not included in the plinth area estimate
(Multiple Choice)
4.8/5
(70)
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
(Multiple Choice)
4.7/5
(91)
The inspection pit or chamber is a manhole provided in a base drainage system
(Multiple Choice)
4.9/5
(78)
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
(Multiple Choice)
4.9/5
(90)