Exam 1: Construction and Measurement
Exam 1: Construction and Measurement25 Questions
Exam 2: Mecasurement and Estimation in Construction Work25 Questions
Exam 3: Measurement and Estimation in Construction23 Questions
Exam 4: Measurement and Specification for Construction and Engineering8 Questions
Select questions type
The rate of payment is made for 100 cu m (per % cu m) in case of
Free
(Multiple Choice)
4.9/5
(71)
Correct Answer:
D
Referring of given figure, pick up the correct statement from the following: 
Free
(Multiple Choice)
5.0/5
(91)
Correct Answer:
D
The main factor to be considered while preparing a detailed estimate, is
Free
(Multiple Choice)
4.8/5
(91)
Correct Answer:
D
According to Indian Standards Institute, the actual size of modular bricks is
(Multiple Choice)
4.8/5
(74)
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
(Multiple Choice)
4.8/5
(75)
For the construction of buildings, the subheads of the estimate are
(Multiple Choice)
4.9/5
(85)
The value of 'B' of Indian type W.C. shown in the given figure is: 
(Multiple Choice)
4.8/5
(84)
While estimating the qualities for the construction of a building, the correct metric unit is
(Multiple Choice)
4.9/5
(76)
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is 
(Multiple Choice)
4.9/5
(75)
The following item of earth work is not measured separately.
(Multiple Choice)
4.9/5
(83)
Cost of fittings and their fixing is specified for the following sanitary fittings
(Multiple Choice)
4.9/5
(77)
Brick walls are measured in sq. m if the thickness of the wall is
(Multiple Choice)
4.9/5
(67)
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
(Multiple Choice)
4.8/5
(82)
Showing 1 - 20 of 25
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)