If the maximum spring rise is 2 m and height of the waves expected is 4 m , then the breakwater height above the datum will be
(Multiple Choice)
4.9/5
(77)
Which one of the following lines is used for tying a ship with a dock?
(Multiple Choice)
4.9/5
(78)