Exam 4: Production and Inventory Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The material handling device which moves materials between two fixed points is _____________.

Free
(Multiple Choice)
4.9/5
(72)
Correct Answer:
Verified

A

Which of the following is defined as a set of activities which help to keep plant, machinery and other facilities in good working condition?

Free
(Multiple Choice)
4.9/5
(91)
Correct Answer:
Verified

B

_________ records graphically or diagrammatically, in sequence the movements connected with a process.

Free
(Multiple Choice)
4.9/5
(67)
Correct Answer:
Verified

A

___________ may be defined as the ratio between output and input.

(Multiple Choice)
4.9/5
(71)

_____________ is one of the functions of materials management.

(Multiple Choice)
4.9/5
(85)

THERBLIGS was coined by _____________.

(Multiple Choice)
5.0/5
(74)

________ function of production planning and control determines the starting time and finishing time for each operation.

(Multiple Choice)
4.9/5
(95)

________________ ensures that, the work is carried out as per the plan and delivery schedules are met.

(Multiple Choice)
4.9/5
(77)

The primary function of plant maintenance does not which of the following_______.

(Multiple Choice)
4.8/5
(75)

The process of deciding the path on which material move from start to finish is known as_______.

(Multiple Choice)
5.0/5
(75)

The manager of inventory would most likely be found in the __________.

(Multiple Choice)
4.7/5
(86)

Which of the following is a production planning technique?

(Multiple Choice)
4.7/5
(82)

In intermittent manufacturing system the goods are produced for __________.

(Multiple Choice)
4.8/5
(98)

VED analysis of inventory management stands for_________

(Multiple Choice)
4.7/5
(88)

_____________ function of production planning and control decides the quantity of output to be produced and the cost involved in it on the basis of sales forecast.

(Multiple Choice)
4.8/5
(79)

Production planning and control starts with ________.

(Multiple Choice)
4.8/5
(75)

___________ study is concerned with the determination of the amount of time required to perform a unit of work.

(Multiple Choice)
5.0/5
(76)

Building construction and maintenance, maintaining service facilities such aswater, gas, steam, compressed air, heating and ventilating, air conditioning, painting,plumbing and carpentry work includes _______________ type of maintenance.

(Multiple Choice)
4.8/5
(75)

______________ material handling device is used to move the material of different sizes and weights.

(Multiple Choice)
4.9/5
(93)

The 4Ms does not include___________.

(Multiple Choice)
4.9/5
(85)
Showing 1 - 20 of 22