The act of linking together the exposed and extraneous metal parts is called:
(Multiple Choice)
4.9/5
(73)
An appropriate wiring method for a high-temperature installation in a boiler house is:
(Multiple Choice)
4.7/5
(78)
A load connected to phase and neutral of a star-connected three-phase four-wire supply system from the local substation would have a voltage of:
(Multiple Choice)
4.7/5
(76)
Which of the following fixing methods would be suitable for holding a PVC insulated and sheathed cable onto a wood surface such as a ceiling joist?
(Multiple Choice)
4.9/5
(63)
A diagram which shows most clearly how a circuit works, with all items represented by graphical symbols, is a description of a:
(Multiple Choice)
4.8/5
(78)
The phase current of a star-connected load is 100 A. The line current will be:
(Multiple Choice)
4.9/5
(78)
The phase voltage of a star-connected load is 100 V. The line voltage will be:
(Multiple Choice)
5.0/5
(85)
An appropriate wiring method for a domestic installation would be a:
(Multiple Choice)
4.8/5
(86)
A scale drawing which shows the actual position of the electrical equipment upon completion of the contract is called a:
(Multiple Choice)
4.7/5
(76)
An appropriate wiring method for a domestic installation would be a:
(Multiple Choice)
4.9/5
(73)
An appropriate wiring method for an underground feed to a remote building would be a:
(Multiple Choice)
4.9/5
(72)
A scale drawing which shows the original intention for the position of electrical equipment is called a:
(Multiple Choice)
4.7/5
(70)
A scale drawing showing the position of equipment by graphical symbols is a description of a:
(Multiple Choice)
4.9/5
(88)
The protection provided by protective equipotential bonding and automatic disconnection of the supply is called:
(Multiple Choice)
4.9/5
(69)
The metalwork of the building and other service pipes is called:
(Multiple Choice)
4.9/5
(70)
To ensure the effective operation of the over-current protective devices, the earth fault loop path must have:
(Multiple Choice)
4.9/5
(75)
According to IET Regulation 411.3.2.2 all final circuits not exceeding 32 A in a building supplied with a 230 V TN supply shall have a maximum disconnection time not exceeding:
(Multiple Choice)
4.9/5
(64)
A protective conductor connecting exposed conductive parts of equipment to the main earthing terminal is one definition of: