Before beginning work on a 'live' circuit or piece of equipment you should:

Free
(Multiple Choice)
5.0/5
(80)
Correct Answer:
Verified

C,D

For electrical test results to be valid the test instruments used:

Free
(Multiple Choice)
4.8/5
(74)
Correct Answer:
Verified

B

PAT testing is carried out on:

Free
(Multiple Choice)
4.8/5
(94)
Correct Answer:
Verified

C,D

The test required by the IET Regulations to ascertain that the CPC is correctly connected is called:

(Multiple Choice)
4.8/5
(76)

'To ensure that the accessories and equipment within a building work as they were intended to work' is one definition of the purpose of:

(Multiple Choice)
4.8/5
(86)

Which hand tools would you use for removing cable insulation?

(Multiple Choice)
4.9/5
(69)

When testing a 230 V installation an insulation resistance tester must supply a voltage of:

(Multiple Choice)
4.8/5
(75)

One objective of the polarity test is to verify that:

(Multiple Choice)
4.8/5
(80)

The value of a satisfactory insulation resistance test on each final circuit of a 230 V installation must be:

(Multiple Choice)
4.8/5
(83)

Under the Health and Safety at Work Act an employee is responsible for:

(Multiple Choice)
4.8/5
(87)

Under the Health and Safety at Work Act an employer is responsible for:

(Multiple Choice)
4.8/5
(82)

The Electricity at Work Regulations absolutely forbid the following work activity:

(Multiple Choice)
4.9/5
(85)

Which hand tools would you use for terminating conductors in a junction box?

(Multiple Choice)
4.8/5
(74)

The maximum inspection and re-test period for a domestic electrical installation is:

(Multiple Choice)
5.0/5
(64)

Instrument calibration certificates are usually valid for a period of:

(Multiple Choice)
4.9/5
(81)

The Electricity at Work Regulations tell us that 'we must ensure the disconnection and separation of electrical equipment from every source of supply and the separation must be secure'. A procedure to comply with this regulation is called:

(Multiple Choice)
4.9/5
(90)

'Good housekeeping' at work is about:

(Multiple Choice)
4.7/5
(87)

When making a test to determine the presence or absence of a voltage, the HSE recommends that for our own safety we should use:

(Multiple Choice)
4.8/5
(84)

A tong test instrument can also correctly be called:

(Multiple Choice)
4.9/5
(77)

Which hand tools would you use to cut across a floorboard before lifting?

(Multiple Choice)
4.8/5
(72)
Showing 1 - 20 of 24