Exam 12: Lean Manufacturing and Activity Analysis

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Traditional manufacturing emphasizes all of the following except

Free
(Multiple Choice)
4.8/5
(67)
Correct Answer:
Verified

A

Reducing wait time is not linked to reducing inventory.

Free
(True/False)
4.8/5
(82)
Correct Answer:
Verified

False

Lean manufacturing favors organizing work around processes rather than around products.

Free
(True/False)
4.9/5
(87)
Correct Answer:
Verified

False

  From the above schedule of activity costs, determine the non-value-added costs. From the above schedule of activity costs, determine the non-value-added costs.

(Multiple Choice)
4.9/5
(80)

Which of the following results in long lead time?

(Multiple Choice)
4.8/5
(91)

Which of the following is characteristic of the traditional cost system?

(Multiple Choice)
5.0/5
(84)

Lean manufacturing is also called make-to-stock manufacturing.

(True/False)
4.9/5
(92)

Christmas Express makes wreaths in batch sizes of 12. The cutting & assembly process takes 8 minutes per wreath and the decorating process time is 10 minutes per wreath. It takes 12 minutes to move the wreaths from the cutting & assembly process to the decorating process. (a) Compute the value-added, non-value-added, and the total lead time of the wreath process. (b) Compute the value-added ratio.  Round to the nearest decimal.

(Short Answer)
4.8/5
(95)

The lean manufacturing philosophy views inventory as an unnecessary waste of resources.

(True/False)
4.7/5
(78)

One inherent risk to using lean philosophy is that companies are at higher risk of inventory shortage during volatile times such as strikes, weather, etc. than when using the traditional philosophy.

(True/False)
5.0/5
(67)

A make-to-order company matches its production schedules to actual customer orders.

(True/False)
4.8/5
(75)

Lean manufacturing is also called make-to-order manufacturing.

(True/False)
4.8/5
(79)

In a lean environment, the journal entry to record conversion costs would include a debit to the manufacturing overhead control account.

(True/False)
4.8/5
(81)

In a lean environment, process problems are more visible than they are in a traditional environment because:

(Multiple Choice)
5.0/5
(95)

Which of the following results in fewer transactions in lean accounting?

(Multiple Choice)
4.8/5
(83)

Lean manufacturing favors organizing work around products rather than around processes.

(True/False)
4.8/5
(87)

Kilbuck Manufacturing operates in a lean manufacturing environment. Kilbuck's actual conversion costs for the month of May follow: Kilbuck Manufacturing operates in a lean manufacturing environment. Kilbuck's actual conversion costs for the month of May follow:   The journal entry to record May's conversion costs will include: The journal entry to record May's conversion costs will include:

(Multiple Choice)
4.8/5
(80)

In a lean environment, process problems are more visible than they are in a traditional environment.

(True/False)
4.9/5
(87)

Lead time is the process time between start and completion.

(True/False)
4.9/5
(99)

Which of the following is not an external failure cost?

(Multiple Choice)
4.8/5
(93)
Showing 1 - 20 of 123
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)