Exam 14: Plumbing Systems
Exam 1: Professional Architectural Careers15 Questions
Exam 2: Exploring Residential Design and Professional Office Practice15 Questions
Exam 3: Preparing for Success15 Questions
Exam 4: Computer-Aided Design in Architecture15 Questions
Exam 5: Guidelines and Codes That Affect Design15 Questions
Exam 6: Interior Design Considerations15 Questions
Exam 7: Exterior Design Factors and Styles15 Questions
Exam 8: Environmental Design Considerations15 Questions
Exam 9: Land Descriptions and Drawings15 Questions
Exam 10: Site-Related Drawing Layout15 Questions
Exam 11: Floor Plans - Symbols, Annotation, and Dimensions15 Questions
Exam 12: Completing a Floor Plan With Cad15 Questions
Exam 13: Electrical Plans15 Questions
Exam 14: Plumbing Systems15 Questions
Exam 15: Comfort Control Systems15 Questions
Exam 16: Roof Plan Components15 Questions
Exam 17: Roof Plan Layout With Cad15 Questions
Exam 18: Introduction to Elevations15 Questions
Exam 19: Elevation Layout and Cad Drawing Techniques15 Questions
Exam 20: Representing Interior Finishing Materials and Cabinets With Cad15 Questions
Exam 21: Framing Methods15 Questions
Exam 22: Structural Components15 Questions
Exam 23: Design Criteria for Structural Loading15 Questions
Exam 24: Sizing Joists, Rafters, and Beams15 Questions
Exam 25: Drawing Framing Plans15 Questions
Exam 26: Foundation Systems15 Questions
Exam 27: Floor Systems and Foundation Support15 Questions
Exam 28: Foundation Plan Layout15 Questions
Exam 29: Sectioning Basics15 Questions
Exam 30: Section Layout15 Questions
Exam 31: Stair Construction and Layout15 Questions
Exam 32: Fireplace Construction and Layout15 Questions
Exam 33: Construction Documentation, Specifications, and Project Manuals15 Questions
Exam 34: Presentation Drawings15 Questions
Exam 35: Renovations, Remodeling, and Additions15 Questions
Select questions type
Which statement about home fire sprinklers is correct?
Free
(Multiple Choice)
4.8/5
(86)
Correct Answer:
B
Hot-water recirculation is the process of constantly moving water through a loop in a hot-water pipe.
Free
(True/False)
4.9/5
(91)
Correct Answer:
True
Green PVC pipe is usually used for _____.
Free
(Multiple Choice)
4.8/5
(82)
Correct Answer:
B
Most cities have a separate storm sewer system to dispose of groundwater, rainwater, surface water, or other nonpolluting waste.
(True/False)
4.9/5
(80)
When placing plumbing in wood framing, holes bored into joists must not exceed _____ of the joist depth.
(Multiple Choice)
4.9/5
(79)
Drain fields can be placed no closer than ____ from a water-table level.
(Multiple Choice)
4.8/5
(80)
Plastic pipes provide a durable material to distribute water and are quickly assembled by the use of soldered joints and fittings.
(True/False)
4.9/5
(78)
What term refers to the vertical drain lines that carry waste from the home to the sewer main?
(Multiple Choice)
4.8/5
(70)
A ____ is an underground branch line that extends from the sewer line to the edge of the street or to the property line.
(Multiple Choice)
4.9/5
(92)
The term ____ refers to the water supply line that extends from the water meter into the home to deliver potable (drinkable) water.
(Multiple Choice)
4.8/5
(75)
The IRC defines a manifold as a unit used to contain and discharge water.
(True/False)
4.9/5
(73)
Hot-water branch lines are normally located ____ from and parallel to cold-water lines.
(Multiple Choice)
4.8/5
(68)
A solar water-heating system is designed to heat water by capturing energy from the sun.
(True/False)
4.9/5
(92)
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)