Exam 10: Percent Percentage
Exam 1: Organization of the Industry28 Questions
Exam 2: Working in the Industry21 Questions
Exam 3: Green Construction29 Questions
Exam 4: Jobsite Safety31 Questions
Exam 5: Safety With Ladders, Scaffolds, and Machines20 Questions
Exam 6: Whole Numbers20 Questions
Exam 7: Decimals21 Questions
Exam 8: Fractions21 Questions
Exam 9: Linear Measure24 Questions
Exam 10: Percent Percentage17 Questions
Exam 11: Area and Volume28 Questions
Exam 12: Right Angles10 Questions
Exam 13: Combined Operations12 Questions
Exam 14: Hand Tools-Selection, Use and Care25 Questions
Exam 15: Power Tools-Selection, Use, and Care21 Questions
Exam 16: Fasteners21 Questions
Exam 17: Rigging21 Questions
Exam 18: Views10 Questions
Exam 19: Scales16 Questions
Exam 20: Alphabet of Lines16 Questions
Exam 21: Use of Symbols20 Questions
Exam 22: Plan Views13 Questions
Exam 23: Elevations10 Questions
Exam 24: Sections and Details10 Questions
Select questions type
A carpenter completes a home remodeling job in 85% of the estimated time. The estimated time is 136 hours. The job actually takes ____________________ hours to complete. (Round to the nearest hour.)
Free
(Short Answer)
4.7/5
(72)
Correct Answer:
116
An alloy of brass is composed of 84.6% copper, 5.20% tin, 6.70% lead, and zinc. The number of pounds of zinc required to make 520.0 pounds of alloy is ____________________.
(Short Answer)
4.9/5
(88)
An engine loses 6.70 horsepower through friction. This power loss is 5.20% of its total rated horsepower. The total horsepower rating is ____________________. (Round to the nearest whole horsepower.)
(Short Answer)
4.9/5
(83)
173.8% of 87.20 is ____________________. (Round to 1 decimal place.)
(Short Answer)
5.0/5
(83)
A casting, when first poured, is 14.872 inches long. The casting shrinks 0.098 inch when it cools. The percent of shrinkage is ____________________. (Round to 2 decimal places.)
(Short Answer)
4.9/5
(87)
The first shift of a manufacturing firm produces 3.6% defective pieces out of a total production of 2,555 pieces. The second shift produces 5.8% defective pieces out of a total production of 2,072 pieces. The first shift produces ____________________ more acceptable pieces than the second shift.
(Short Answer)
4.9/5
(76)
Find the simple interest and the amount on $1000 at 15% after 3 years.
(Short Answer)
5.0/5
(74)
Find the interest after a 7 month period if the annual rate of interest on $1000.00 is 12%.
(Short Answer)
4.9/5
(65)
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)