Lean operations reduce the number of suppliers the organizationworks with by limiting contacts to two tiers of suppliers.

(True/False)
4.8/5
(85)

In a lean environment, anything not essential to the product or process is viewed as waste.

(True/False)
4.8/5
(84)

The goal of maintenance is to maintain the productive system in good working order while minimizing

(Multiple Choice)
4.8/5
(86)

The small lot-sizing policy works well in a situation where both holding costs and setup costs are high.

(True/False)
5.0/5
(96)

The four building blocks of lean operations are: product design, process design, personnel/organizational elements, and manufacturing planning and control.

(True/False)
4.8/5
(103)

Ideally, preventive maintenance will be performed

(Multiple Choice)
4.8/5
(77)

A reactive approach to maintenance is _____ maintenance.

(Multiple Choice)
4.9/5
(67)

"Autonomation" indicates that the firm is attempting to reduce its dependence on automated equipment.

(True/False)
5.0/5
(80)

The approaches used in lean systems to deal with quality include(I)designing quality into products and processes(II)insisting vendors provide high-quality materials(III)expecting workers to be involved in continuous improvement(IV)training workers in statistical process control(V)100 percent inspection of raw materials, work-in-process, and finished goods

(Multiple Choice)
4.9/5
(78)

Preventive maintenance is generally scheduled on the basis of

(Multiple Choice)
4.9/5
(79)

One basis for scheduling preventive maintenance is passage of time.

(True/False)
4.7/5
(74)

When lean is used in the context of services, which of the following is most often the focus?

(Multiple Choice)
4.8/5
(83)

The goal of maintenance is to maintain the productive system in good working order while minimizing or eliminating the cost of preventive maintenance.

(True/False)
4.8/5
(73)

Which of the following questions is not answered by value stream mapping?

(Multiple Choice)
4.8/5
(78)

In the lean philosophy, producinglarge lot sizes reduces waste.

(True/False)
4.8/5
(78)

Lean systems often use layouts that are based on multiple manufacturing cells.

(True/False)
4.8/5
(78)

Which of the following contributes to the competitive advantage enjoyed by service firms using lean concepts?

(Multiple Choice)
4.8/5
(86)

A lean-systems method of asking questions about a process is the __________ approach.

(Multiple Choice)
4.9/5
(68)

Attempting to determine when preventive maintenance activities should be performed is called

(Multiple Choice)
4.8/5
(82)

Although inventories are maintained, the goal of lean operations is to minimize safety stock.

(True/False)
4.9/5
(85)