Exam 16: Maintenance and Reliability
Exam 1: Operations and Productivity138 Questions
Exam 2: Operations Strategy in a Global Environment134 Questions
Exam 3: Project Management131 Questions
Exam 4: Forecasting148 Questions
Exam 5: Design of Goods and Services126 Questions
Exam 6: Managing Quality226 Questions
Exam 7: Process Strategies259 Questions
Exam 8: Location Strategies233 Questions
Exam 9: Human Resources, Job Design, and Work Measurement321 Questions
Exam 10: Supply Chain Management158 Questions
Exam 11: Inventory Management230 Questions
Exam 12: Aggregate Planning and Sop122 Questions
Exam 13: Material Requirements Planning Mrp and Erp133 Questions
Exam 14: Short-Term Scheduling124 Questions
Exam 15: Lean Operations122 Questions
Exam 16: Maintenance and Reliability119 Questions
Exam 17: Decision-Making Tools101 Questions
Exam 18: Linear Programming102 Questions
Exam 19: Transportation Models92 Questions
Exam 20: Waiting-Line Models126 Questions
Exam 21: Learning Curves114 Questions
Exam 22: Simulation78 Questions
Exam 23: Applying Analytics to Big Data in Operations Management61 Questions
Select questions type
Which of the following is TRUE regarding total productive maintenance (TPM)?
(Multiple Choice)
4.7/5
(85)
The ________ takes into account such costs as deteriorated customer relations and lost sales.
(Short Answer)
4.8/5
(61)
Ten high-intensity bulbs are tested for 100 hours each. One failed at 10 hours; all others completed the test. Calculate FR(%), FR(N) and MTBF.
(Essay)
4.8/5
(71)
________ is a plan that involves routine inspections, servicing, and keeping facilities in good repair to prevent failure.
(Short Answer)
4.9/5
(75)
DuLarge Marine manufactures diesel engines for shrimp trawlers and other small commercial boats. One of their CNC machines has caused several problems. Over the past 30 weeks, the machine has broken down as indicated below.
What is the expected number of breakdowns per week?
(Multiple Choice)
4.8/5
(77)
TPM (total productive maintenance) is an application of TQM (total quality management) principles to the area of maintenance.
(True/False)
4.9/5
(66)
Given the following data, find the expected breakdown cost. The cost per breakdown is $100.

(Essay)
4.8/5
(74)
Ten high-technology batteries are tested for 200 hours each. Two failed at 20 hours; all others completed the test. FR(%) is ________ and MTBF is ________.
(Multiple Choice)
4.9/5
(58)
Suppose that the introduction of a preventive maintenance program is deemed cost effective. Which of the following is most likely TRUE if the cost to actually perform preventive maintenance is very expensive?
(Multiple Choice)
4.8/5
(85)
A two-component process has a 90.25% success rate in series and a 99.75% success rate in parallel. If each component has the same reliability, what is the reliability of an individual component?
(Multiple Choice)
4.8/5
(76)
The MTBF distributions of products, machines, or processes that have "settled in," or gone beyond the infant mortality phase, often follow the exponential distribution.
(True/False)
4.8/5
(88)
Infant mortality refers to the high failure rate often encountered in the early stages of the lifetime of a product.
(True/False)
4.8/5
(71)
DuLarge Marine manufactures diesel engines for shrimp trawlers and other small commercial boats. One of their CNC machines has caused several problems. Over the past 30 weeks, the machine has broken down as indicated below. Each time the machine breaks down, the firm loses an average of $2,000 in time and repair expenses. If preventive maintenance were implemented, it is estimated that an average of only one breakdown per week would occur. The cost of preventive maintenance is $1,000 per week.
What is the weekly total maintenance cost of the best program?
(Multiple Choice)
4.8/5
(75)
A simple electrical motor has three components: windings, armature, and housing. These three components have reliabilities of .993, .95, and .999. There is no possibility of redundant parts. The motor must have an overall reliability of at least 0.980, according to the product line manager who will use the motor as an input. What would you do to redesign the motor to meet this specification? Discuss, including a recalculation to meet the standard.
(Essay)
4.8/5
(81)
Ten high-intensity bulbs are tested for 100 hours each. One failed at 40 hours; another failed at 70 hours; all others completed the test. Calculate FR(%), FR(N), and MTBF.
(Essay)
5.0/5
(72)
The diagram below identifies the elements of service as provided by a soft drink vending machine. Each element has an estimate of its own reliability, independent of the others. What is the reliability of the "system"?

(Essay)
4.9/5
(71)