Exam 3: Quality and Performance

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

When should complete inspection be used?

(Multiple Choice)
4.9/5
(81)

The investment a company makes in training employees to perform their duties and redesigning products and processes to improve them would be categorized as prevention costs.

(True/False)
4.8/5
(79)

One chart commonly used for quality measures based on product or service attributes is the xˉ \bar{x} chart.

(True/False)
4.8/5
(81)

Small groups of employees and supervisors that meet to identify, analyze, and solve process and quality problems are known as ________.

(Short Answer)
4.9/5
(75)

Quality measured with reference to price is captured by the notion of:

(Multiple Choice)
4.8/5
(76)

Samples of size 4 were taken from a process that had a target of 25 ounces with upper and lower specification limits of 30 ounces and 20 ounces respectively. Create the appropriate control charts and determine whether the process is in control. Samples of size 4 were taken from a process that had a target of 25 ounces with upper and lower specification limits of 30 ounces and 20 ounces respectively. Create the appropriate control charts and determine whether the process is in control.

(Essay)
4.8/5
(81)

Applying Six Sigma to service processes is more challenging than for manufacturing processes.

(True/False)
4.9/5
(68)

Table 5.11 Factors for Calculating Three-Sigma Limits for the xˉ \bar{x} Chart and R-Chart  Table 5.11 Factors for Calculating Three-Sigma Limits for the   \bar{x}     Chart and R-Chart     Source: 1950 ASTM Manual on Quality Control of Materials, copyright American Society for Testing Materials. Reprinted with permission. -Thermostats are subjected to rigorous testing before they are shipped to air conditioning technicians around the world. Results from the last five samples are shown in the table. Calculate control limits for a chart that will monitor performance to target. The correct control limits as (LCL,UCL) are:   Source: 1950 ASTM Manual on Quality Control of Materials, copyright American Society for Testing Materials. Reprinted with permission. -Thermostats are subjected to rigorous testing before they are shipped to air conditioning technicians around the world. Results from the last five samples are shown in the table. Calculate control limits for a chart that will monitor performance to target. The correct control limits as (LCL,UCL) are:  Table 5.11 Factors for Calculating Three-Sigma Limits for the   \bar{x}     Chart and R-Chart     Source: 1950 ASTM Manual on Quality Control of Materials, copyright American Society for Testing Materials. Reprinted with permission. -Thermostats are subjected to rigorous testing before they are shipped to air conditioning technicians around the world. Results from the last five samples are shown in the table. Calculate control limits for a chart that will monitor performance to target. The correct control limits as (LCL,UCL) are:

(Multiple Choice)
4.7/5
(74)

A process with a target of 25 was used to generate the following data points. Is the process properly centered? A process with a target of 25 was used to generate the following data points. Is the process properly centered?

(Essay)
4.9/5
(83)

Using a value of 0.729 for the A₂ lookup from Table 5.1 yields: UCL = 24.6 + 0.729*5.73 = 28.8 LCL = 24.6 - .729*5.73 = 20.4 Using a value of 0.729 for the A₂ lookup from Table 5.1 yields: UCL = 24.6 + 0.729*5.73 = 28.8 LCL = 24.6 - .729*5.73 = 20.4     The chart is in control. -A professor records the number of students who complain each week throughout the semester. If the class size is forty students, what are 3-sigma control limits for this class? Construct a control chart and interpret the data.   The chart is in control. -A professor records the number of students who complain each week throughout the semester. If the class size is forty students, what are 3-sigma control limits for this class? Construct a control chart and interpret the data. Using a value of 0.729 for the A₂ lookup from Table 5.1 yields: UCL = 24.6 + 0.729*5.73 = 28.8 LCL = 24.6 - .729*5.73 = 20.4     The chart is in control. -A professor records the number of students who complain each week throughout the semester. If the class size is forty students, what are 3-sigma control limits for this class? Construct a control chart and interpret the data.

(Essay)
5.0/5
(82)

The defect rate for a product has historically been about 2.0%. What are the upper and lower control chart limits if you wish to use a sample size of 100 and 3-sigma limits?

(Essay)
4.8/5
(84)

Table 5.11 Factors for Calculating Three-Sigma Limits for the xˉ \bar{x} Chart and R-Chart  Table 5.11 Factors for Calculating Three-Sigma Limits for the   \bar{x}     Chart and R-Chart     Source: 1950 ASTM Manual on Quality Control of Materials, copyright American Society for Testing Materials. Reprinted with permission. -Thermostats are subjected to rigorous testing before they are shipped to air conditioning technicians around the world. Results from the last five samples are shown in the table. Calculate control limits for a chart that will monitor process consistency. The correct control limits as (LCL,UCL) are:   Source: 1950 ASTM Manual on Quality Control of Materials, copyright American Society for Testing Materials. Reprinted with permission. -Thermostats are subjected to rigorous testing before they are shipped to air conditioning technicians around the world. Results from the last five samples are shown in the table. Calculate control limits for a chart that will monitor process consistency. The correct control limits as (LCL,UCL) are:  Table 5.11 Factors for Calculating Three-Sigma Limits for the   \bar{x}     Chart and R-Chart     Source: 1950 ASTM Manual on Quality Control of Materials, copyright American Society for Testing Materials. Reprinted with permission. -Thermostats are subjected to rigorous testing before they are shipped to air conditioning technicians around the world. Results from the last five samples are shown in the table. Calculate control limits for a chart that will monitor process consistency. The correct control limits as (LCL,UCL) are:

(Multiple Choice)
4.9/5
(80)

Because Six Sigma involves the elimination of defects, it can only be applied in manufacturing processes.

(True/False)
4.8/5
(69)

Quality at the source refers to the effort to catch and correct any mistakes as they are being made by those that are making them.

(True/False)
4.9/5
(72)

Table 5.11 Factors for Calculating Three-Sigma Limits for the xˉ \bar{x} Chart and R-Chart  Table 5.11 Factors for Calculating Three-Sigma Limits for the   \bar{x}     Chart and R-Chart     Source: 1950 ASTM Manual on Quality Control of Materials, copyright American Society for Testing Materials. Reprinted with permission. -Construct 3-sigma X-bar and R-charts using the data in the table. What conclusions can you draw about the state of control for this process?   Source: 1950 ASTM Manual on Quality Control of Materials, copyright American Society for Testing Materials. Reprinted with permission. -Construct 3-sigma X-bar and R-charts using the data in the table. What conclusions can you draw about the state of control for this process?  Table 5.11 Factors for Calculating Three-Sigma Limits for the   \bar{x}     Chart and R-Chart     Source: 1950 ASTM Manual on Quality Control of Materials, copyright American Society for Testing Materials. Reprinted with permission. -Construct 3-sigma X-bar and R-charts using the data in the table. What conclusions can you draw about the state of control for this process?

(Multiple Choice)
4.8/5
(82)

With respect to the systems approach of TQM, failure to manage the ________ is where most companies fall short in achieving quality objectives.

(Short Answer)
4.8/5
(75)

A bank randomly looks at loan applications and checks them for errors. Ten applications and the number of errors identified on the applications are found in the following table. When the process is working correctly, the average number of errors found is 2. Construct a c-chart to determine if the process is in control. A bank randomly looks at loan applications and checks them for errors. Ten applications and the number of errors identified on the applications are found in the following table. When the process is working correctly, the average number of errors found is 2. Construct a c-chart to determine if the process is in control.

(Essay)
4.9/5
(72)

What is the long-term impact of unethical business practices on product and service quality?

(Essay)
4.8/5
(73)

The upper and lower control limits for a component are 0.150 cm. and 0.120 cm., with a process target of .135 cm. The process standard deviation is 0.004 cm. and the process average is 0.138 cm. What is the process capability index?

(Multiple Choice)
4.8/5
(69)

Process centering is shown by an xˉ \bar{x} chart.

(True/False)
4.8/5
(80)
Showing 101 - 120 of 198