The TQM wheel features ________ at its center.

(Multiple Choice)
4.8/5
(87)

Historically, the average time to service a customer complaint has been 3 days and the standard deviation has been 0.50 day. Management would like to specify the control limits for an chart with a sample size of 10 and 3- sigma limits. The UCL for the xˉ \bar{x} chart would be:

(Multiple Choice)
4.8/5
(82)

The Baldrige Performance Excellence Program considers a company's business results but ISO 9001:2008 registration does not.

(True/False)
4.8/5
(86)

Why is employee empowerment important in a total quality management program?

(Essay)
4.9/5
(87)

A manufacturer embarking on a Six Sigma program sets the goal of having True Six Sigma capability for all processes by the end of the month. If their current process capability index on a key metric is less than 2.0 and the process capability ratio is 1.70, what must happen with the process standard deviation?

(Multiple Choice)
4.8/5
(86)

A professor, dissatisfied with a product he's purchased, bad mouths the product to his class, resulting in decreased market share (since the students believe everything he tells them). The manufacturer suffers:

(Multiple Choice)
4.9/5
(92)

Rejecting product materials due to poor quality of the samples would be an example of which TQM pillar?

(Multiple Choice)
4.7/5
(79)

The Six Sigma improvement model can be applied both to projects involving incremental improvements to processes and to projects requiring major changes.

(True/False)
4.8/5
(80)

Wider limits on a control chart result in lower probability of a type I error.

(True/False)
4.8/5
(81)

One of the main challenges in developing the proper culture for TQM is to:

(Multiple Choice)
4.8/5
(77)

A quality-focused CEO who promotes a culture of quality is an example of which of the four TQM pillars?

(Multiple Choice)
4.8/5
(80)

A manufacturer embarking on a Six Sigma program sets the goal of having True Six Sigma capability for all processes by the end of the month. If their current process capability index on a key metric is less than 2.0 and the process capability ratio is 1.5, what must happen with the process standard deviation?

(Multiple Choice)
4.9/5
(81)

The defect rate for a product has historically been about 5.0%. What is the upper control chart limit if you wish to use a sample size of 50 and 3-sigma limits?

(Multiple Choice)
4.7/5
(89)

When considering the plan-do-study-act cycle for problem solving, instructing other employees in the use of the new process occurs in the ________ step.

(Multiple Choice)
4.9/5
(81)

Statistical process control (SPC) is the application of statistical techniques to determine whether a quantity of material should be accepted or rejected.

(True/False)
4.8/5
(71)

________ is the international standard governing documentation of a quality program.

(Short Answer)
4.8/5
(78)

A company is interested in monitoring the average time it takes to serve its customers. An appropriate control chart would be:

(Multiple Choice)
5.0/5
(93)

Jerry watched in awe as Warren went to 2 sigma limits from the company-mandated 3 sigma limits, thereby increasing the likelihood of a type ________ error.

(Short Answer)
4.7/5
(74)

A manufacturer embarking on a Six Sigma program sets the goal of having True Six Sigma capability for all processes by the end of the month. If their current process capability index on a key metric is less than 2.0 and the process capability ratio is 1.25, what must happen with the process standard deviation?

(Multiple Choice)
4.8/5
(72)

Which of these elements is not part of the Deming Wheel?

(Multiple Choice)
4.9/5
(87)