Exam 24: Supplement G Acceptance Sampling Plans
Exam 1: Using Operations to Create Value115 Questions
Exam 2: Process Strategy and Analysis239 Questions
Exam 3: Quality and Performance198 Questions
Exam 4: Capacity Planning120 Questions
Exam 5: Constraint Management136 Questions
Exam 6: Lean Systems166 Questions
Exam 7: Project Management139 Questions
Exam 8: Forecasting150 Questions
Exam 9: Inventory Management205 Questions
Exam 10: Operations Planning and Scheduling149 Questions
Exam 11: Resource Planning124 Questions
Exam 12: Supply Chain Design77 Questions
Exam 13: Supply Chain Logistic Networks114 Questions
Exam 14: Supply Chain Integration120 Questions
Exam 15: Supply Chain Sustainability78 Questions
Exam 16: Supplement A Decision Making107 Questions
Exam 17: Supplement J Operations Scheduling123 Questions
Exam 18: Supplement K Layout39 Questions
Exam 19: Supplement B Waiting Lines111 Questions
Exam 20: Supplement C Special Inventory Models53 Questions
Exam 21: Supplement D Linear Programming87 Questions
Exam 22: Supplement E Simulation54 Questions
Exam 23: Supplement F Financial Analysis55 Questions
Exam 24: Supplement G Acceptance Sampling Plans87 Questions
Exam 25: Supplement H Measuring Output Rates108 Questions
Exam 26: Supplement I Learning Curve Analysis50 Questions
Select questions type
A single-sampling plan by attributes is needed for a purchased component. Given the following information, what is the consumer's risk? Table G.1 is appended to this exam. Sample size = 125
Acceptance number (c) = 4
Acceptance quality level (AQL) = 0.02
Lot tolerance proportion defective (LTPD) = 0.07
(Multiple Choice)
4.8/5
(75)
A single-sampling plan by attributes is needed for a purchased component. Given the following information, what is the consumer's risk? Table G.1 is appended to this exam. Sample size = 100
Acceptance number (c) = 1
Acceptance quality level (AQL) = 0.02
Lot tolerance proportion defective (LTPD) = 0.07
(Multiple Choice)
4.9/5
(81)
A double-sampling plan is usually less expensive than a single-sampling plan if the lot has a high number of defectives.
(True/False)
4.8/5
(69)
As more firms initiate total quality management systems, the need for acceptance sampling will increase.
(True/False)
4.8/5
(87)
A single-sampling plan by attributes is needed for a purchased component. Table G.1 is appended to this exam.
Sample size = 80
Acceptance number (c) = 1
Acceptance quality level (AQL) = 0.02
Lot tolerance proportion defective (LTPD) = 0.06
Given the preceding information, draw the OC curve for this plan.
(Essay)
4.7/5
(76)
A single-sampling plan by attributes is needed for a purchased component. Given the following information, what is the consumer's risk? Table G.1 is appended to this exam. Sample size = 100
Acceptance number (c) = 1
Acceptance quality level (AQL) = 0.01
Lot tolerance proportion defective (LTPD) = 0.05
(Multiple Choice)
4.9/5
(73)
Discuss the two incorrect conclusions that can be made when using acceptance sampling.
(Essay)
5.0/5
(79)
Rectified inspection occurs when all defective items in the lot are replaced with good items if the lot is rejected and any defective items in the samples are replaced if the lot is accepted.
(True/False)
4.8/5
(89)
________ is an inspection procedure used to determine whether to accept or reject a specific quantity of material.
(Short Answer)
4.9/5
(89)
A quality manager has established a sampling plan that calls for a sample size of 75 units from a shipment of 5,000 pieces and an acceptance number of 2. The supplier has agreed to a contract that calls for an AQL of 0.02 and an LTPD of .04. What is the AOQ if the actual percentage of defectives in the lot is 2%? Table G.1 is appended to this exam.
(Multiple Choice)
4.9/5
(72)
Use Table G.1 for the following question. What is the acceptance number of a single-sampling plan if n = 300, LPTD = 0.02, and = 0.15?
(Multiple Choice)
4.8/5
(80)
A double-sampling plan has n₁ = 50, n₂ = 100, c₁ = 2, and c₂ = 4. Suppose the first sample revealed two defectives. What should be done?
(Multiple Choice)
4.9/5
(83)
This OC curve represents a sampling plan developed for a lot size of 1,000, a sample size of 15, and an acceptance number of 2. The probability of acceptance for each of the first six points appears next to the plotted point. What incoming fraction defective is associated with the average outgoing quality limit? 
(Multiple Choice)
4.8/5
(93)
A single-sampling plan by attributes is needed for a purchased component. Given the following information, what is the producer's risk? Table G.1 is appended to this exam. Sample size = 75
Acceptance number (c) = 3
Acceptance quality level (AQL) = 0.01
Lot tolerance proportion defective (LTPD) = 0.04
(Multiple Choice)
4.8/5
(83)
A single-sampling plan by attributes is needed for a purchased component. Table G.1 is appended to this exam.
Sample size = 80
Acceptance number (c) = 1
Acceptance quality level (AQL) = 0.02
Lot tolerance proportion defective (LTPD) = 0.06
Given the preceding information draw the AOQ curve and determine the AOQL.
(Essay)
5.0/5
(74)
The AOQL is the highest point in the plot of AOQ over all possible values of the proportion defective.
(True/False)
4.8/5
(69)
This OC curve represents a sampling plan developed for a lot size of 500, a sample size of 15, and an acceptance number of 2. The probability of acceptance for each of the first six points appears next to the plotted point. What is the average outgoing quality for an incoming fraction defective of 0.15? 
(Multiple Choice)
4.8/5
(80)
Showing 61 - 80 of 87
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)