Exam 15: Lean Accounting and Productivity Measurement
Exam 1: Introduction to Cost Management154 Questions
Exam 2: Basic Cost Management Concepts191 Questions
Exam 3: Cost Behavior187 Questions
Exam 4: Activity-Based Costing202 Questions
Exam 5: Product and Service Costing: Job-Order System142 Questions
Exam 6: Process Costing176 Questions
Exam 7: Allocating Costs of Support Departments and Joint Products160 Questions
Exam 8: Budgeting for Planning and Control206 Questions
Exam 9: Standard Costing: a Functional-Based Control Approach119 Questions
Exam 10: Decentralization: Responsibility Accounting, Performance133 Questions
Exam 11: Strategic Cost Management124 Questions
Exam 12: Activity-Based Management143 Questions
Exam 13: The Balanced Scorecard: Strategic-Based Control114 Questions
Exam 14: Quality and Environmental Cost Management192 Questions
Exam 15: Lean Accounting and Productivity Measurement165 Questions
Exam 16: Cost-Volume-Profit Analysis129 Questions
Exam 17: Activity Resource Usage Model and Tactical Decision Making116 Questions
Exam 18: Pricing and Profitability Analysis150 Questions
Exam 19: Capital Investment120 Questions
Exam 20: Inventory Management: Economic Order Quantity, Jit, and the Theory of Constraints119 Questions
Select questions type
Which of the following is true of non-value-added activities?
(Multiple Choice)
4.9/5
(75)
Explain the difference between partial and total measures of productivity.
(Essay)
5.0/5
(76)
At the end of 2018, Diatomic Company implemented a new labor process and redesigned its product with the expectation that input usage efficiency would increase. Now, at the end of 2019, the president of the company wants an assessment of the changes on the company's productivity. The data needed for the assessment are as follows: 2019 2018 Output 45,000 54,000 Output prices \ 10 \ 10 Materials (lbs.) 22,500 22,950 Materials unit price \ 3 \4 Labor (hrs.) 18,000 16,875 Labor rate per hour \ 5 \ 5 Power (kwh) 11,250 14,625 Price per kwh \ 2 \ 3
What is the total change in profits from 2018 to 2019?
(Multiple Choice)
4.9/5
(81)
What approach is normally used to calculate product costs when products in a value stream are heterogeneous?
(Multiple Choice)
4.8/5
(80)
The measure of input and output used by an operational productivity measure is called:
(Multiple Choice)
5.0/5
(85)
Identification of a "value stream," pursuit of perfection, and making value flow without interruption are examples of
(Multiple Choice)
4.9/5
(69)
Holstein Company produces pants that use two inputs-materials and labor. During the past quarter, 1,000 units were produced, requiring 2,000 pounds of material and 1,000 hours of labor. An engineering efficiency study commissioned by the local university revealed that Holstein Company can produce the same output of 1,000 units using either of the following two combinations of inputs:
Materials labor Combination A 1,750 875 Combination B 2,000 750
The cost of materials is $2.50 per pound; the cost of labor is $5 per hour.
Required:
a.Compute the productivity ratio for each input of Combination A.
b.Does this represent a productivity improvement over the current use of inputs?
c.What is the total dollar value of the combination A improvement? Classify this as a technical or input trade-off efficiency improvement.
(Essay)
4.9/5
(72)
Which of the following is NOT a limitation of a value stream cost assignment?
(Multiple Choice)
4.9/5
(83)
Which of the following is true of the two-dimensional matrix with respect to lean manufacturing?
(Multiple Choice)
4.9/5
(79)
The worth of one or more features of a product for which the customer is willing to pay is defined as:
(Multiple Choice)
4.8/5
(76)
Reducing the time it takes to configure equipment to produce a different product is an example of
(Multiple Choice)
4.7/5
(78)
The productivity measure(s) in which inputs and outputs are expressed in dollars is(are) called:
(Multiple Choice)
4.9/5
(83)
The prior period used to set the benchmark for measuring productivity changes is(are) called:
(Multiple Choice)
4.9/5
(98)
Partial measures allow managers to focus on the use of the total production and are easily interpreted.
(True/False)
4.8/5
(69)
The productivity measure of all inputs simultaneously is called total productivity measurement.
(True/False)
4.9/5
(91)
Maximizing customer value, on-demand production, and zero setup times are realized in the pursuit of __________ .
(Short Answer)
4.8/5
(61)
Why might labor costs be reduced in a value stream system?
(Multiple Choice)
4.9/5
(73)
Showing 141 - 160 of 165
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)