Exam 11: Six Sigma And Process Improvement

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

In Six Sigma terminology,the expectations of customers that matter most to them are known as:

(Multiple Choice)
4.8/5
(68)

Which of the following is NOT a tool used in the Define stage of DMAIC?

(Multiple Choice)
4.9/5
(69)

In a service context,lean production is referred to as:

(Multiple Choice)
4.9/5
(88)

Focusing on how to maintain improvements occurs in which DMAIC phase?

(Multiple Choice)
4.8/5
(75)

The process of drilling down to a more specific problem statement is sometimes called:

(Multiple Choice)
4.7/5
(87)

A Six Sigma quality level means that the difference between the upper and lower specification limits is six standard deviations.

(True/False)
4.8/5
(79)

Accomplishment of any improvement that takes an organization to unprecedented levels of performance is known as:

(Multiple Choice)
4.9/5
(71)

Explain what is meant by "Six Sigma quality" with respect to defect expectations.Draw a picture that relates Six Sigma quality to the notions of design tolerance and process variability.

(Essay)
4.8/5
(75)

Terms such as "kanban","single minute exchange of dies",and "visual controls" are most closely associated with:

(Multiple Choice)
4.9/5
(99)

A _____ is a _____ of the data from the largest frequency to the smallest.

(Multiple Choice)
4.7/5
(92)

A change in quality level from 3-sigma to 4-sigma represents a:

(Multiple Choice)
4.9/5
(91)

The Six-Sigma problem solving approach contains the phases of:

(Multiple Choice)
4.8/5
(66)

The improvement methodologies proposed by Deming,Juran,and Crosby have common themes which are shared in the Six Sigma approach.

(True/False)
4.9/5
(75)

Efficiency problems:

(Multiple Choice)
4.8/5
(81)

Six Sigma represents a quality level of at most:

(Multiple Choice)
4.9/5
(80)

Explain why,in the initial stages of Six Sigma implementation in a firm,it is advantageous to choose project that have a high likelihood of success.

(Essay)
4.8/5
(64)

At a Six Sigma quality level,3.4 defects per million opportunities are expected to occur with a mean shift of _____ standard deviations of the target.

(Multiple Choice)
4.8/5
(86)

At the outset of a Six Sigma initiative,projects chosen should have a high likelihood of success.

(True/False)
4.9/5
(84)

Explain the concept of lean production.Describe its relation to Six Sigma.

(Essay)
4.9/5
(81)

Cause and effect diagrams are used at the _____ stage in DMAIC.

(Multiple Choice)
5.0/5
(76)
Showing 41 - 60 of 78
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)