Exam 9: Location and Layout
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
Balance the assembly line using the information below,and the longest work-element time rule.The desired output is 360 units per day.Available production time per day is 480 minutes.What is the efficiency for the balanced assembly line?
Work Element Time () Immediate Predecessor () 30 -\@cdots 20 50 45 30 55 , 35 , 40
(Essay)
4.8/5
(70)
________ is a key factor in determining how conveniently customers can carry on business with a firm.
(Short Answer)
4.9/5
(83)
Table 9.21
Table 7.21 The following information is given about an assembly line.
The desired output rate is 90 units per hour.
Work Element Time (sec) Immediate Predecessor () 10 -- 6 15 20 12 14 , 8 20 ,
-A line balancing solution has been developed for the assembly line for fertilizer spreaders at Green Grass,Inc.The desired output rate of 30 spreaders per hour will be achieved.The sum of times for all tasks performed on the line is 1200 seconds for each spreader assembled.This is the total productive time.Which of the following statements must be TRUE?
(Multiple Choice)
4.7/5
(84)
Table 9.6
Nuts-and-Bolts Inc. wishes to find the best location for a plant
that will satisfy customer demand in the following five areas.
Area Coordinates Demand (7,3) 30 (7,7) 40 (1,10) 45 (2,6) 15 (4,5) 25
-The operations manager has narrowed down the search for a new plant to three locations.Fixed and variable costs follow:
Location Fixed Cost per Year Variable Cost per Unit \ 75,000 \ 31 250,000 12 300,000 15
Plot the total cost curves in the chart provided below,and identify the range over which each location would be best.Then use break-even analysis to calculate exactly the break-even quantity that defines each range.
Which of the following statements is correct?
(Multiple Choice)
4.9/5
(75)
Table 9.2
Durham Toy, Inc. has five distribution centers at the location coordinates
given as follows. The monthly demand at each center is also given.
Coordinates Demand (10,12) 40 (25,30) 25 (8,15) 30 (11,20) 10 (25,6) 20
-Use the information in Table 9.2.If the plant is located at the center of gravity,what is the load-distance score,assuming Euclidean distance?
(Multiple Choice)
4.7/5
(79)
Table 9.2
Durham Toy, Inc. has five distribution centers at the location coordinates
given as follows. The monthly demand at each center is also given.
Coordinates Demand (10,12) 40 (25,30) 25 (8,15) 30 (11,20) 10 (25,6) 20
-A single facility is needed to meet the demand of four regions depicted as follows:
Region Center Coordinates Demand A (2,10) 20 B (7,10) 5 C (2,2) 10 D (7,4) 10
If the plant is located at A,what is the total load-distance score,assuming Euclidean distance?
(Multiple Choice)
4.8/5
(74)
The load-distance method is a qualitative model used to evaluate locations.
(True/False)
4.9/5
(88)
The rectilinear distance between points A (15,25)and B (45,5)is
(Multiple Choice)
4.9/5
(78)
The balance delay is the amount by which efficiency falls short of 100 percent.
(True/False)
4.9/5
(83)
Table 9.6
Nuts-and-Bolts Inc. wishes to find the best location for a plant
that will satisfy customer demand in the following five areas.
Area Coordinates Demand (7,3) 30 (7,7) 40 (1,10) 45 (2,6) 15 (4,5) 25
-Use the information in Table 9.6.If the plant is located at the coordinates (6,5),what is the total load-distance score,assuming Euclidean distance?
(Multiple Choice)
4.9/5
(70)
Table 9.9
The administration department of a small college is now designing its layout for newly built office space. From statistical samplings over the last three months, the following trip matrix was developed for daily trips between departments.
Trip Matrix (trips/day)
- 10 75 140 - 95 - 130 130 - 10 - 95 -
-Use the information in Table 9.9.One block plan suggested for the department looks as follows:
What is the total load-distance score of this plan using rectilinear distance and assuming departments A and B are 3 units of distance apart?
(Multiple Choice)
4.7/5
(74)
________ involves decisions about the physical arrangement of economic activity centers within a facility.
(Short Answer)
4.8/5
(82)
Explain the distinction between the use of heuristics,simulation,or optimization as analytical procedures to support location decisions.
(Essay)
4.9/5
(77)
A preference matrix combines qualitative factors and quantitative scores to compare several sites being considered in a location decision.
(True/False)
4.8/5
(81)
An advantage of flexible-flow layouts over line-flow layouts is that the process is less vulnerable to changes in product mix.
(True/False)
4.8/5
(81)
Which one of the following characteristics is more likely for a product layout than for a process layout?
(Multiple Choice)
4.9/5
(73)
Critical mass refers to several competing firms clustering in one location to attract customers.
(True/False)
5.0/5
(78)