Exam 9: Location and Layout
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
A qualitative factor is one that can be evaluated in dollar terms,such as community attitudes or quality of life.
(True/False)
4.7/5
(61)
Table 9.21
Table 7.21 The following information is given about an assembly line.
The desired output rate is 90 units per hour.
Work Element Time (sec) Immediate Predecessor () 10 -- 6 15 20 12 14 , 8 20 ,
-Use the information in Table 9.21.Suppose that the desired output rate is increased to 120 units per hour and a solution has been found that has 4 workstations.What is the efficiency of this new assembly line?
(Multiple Choice)
4.8/5
(78)
Locating work centres in a facility primarily depends on the absolute location within the facility; the location of work centre relative to other work centres is not a key consideration.
(True/False)
4.8/5
(71)
A firm of four departments has the following trip matrix and current block plan of all departments:
Dept. Name -- 14 6 9 -- 7 16 2 \@cdots
a.What is the load-distance score for the current layout? (Assume rectilinear distance and that the distance between departments A and B is one unit of distance.)
b.What would be the load-distance score for the following layout?
(Essay)
4.9/5
(88)
Which of the following statements on locating facilities in the service sector is best?
(Multiple Choice)
4.9/5
(66)
Table 9.11
A company of four departments has the following
trip matrix and current locations of all departments:
Trips Between Departments
- 18 0 25 - 30 0 - 12 -
Current Layout
A B C D
-Use the information in Table 9.11.To reduce the load-distance score,the departments were relocated.Which of the following new layouts has the smallest load-distance score?
(Multiple Choice)
4.9/5
(86)
Relative to product layouts,an advantage of process layouts is that production planning and control is generally less difficult.
(True/False)
4.7/5
(72)
When volumes are high,an advantage of product layouts over process layouts is that less unproductive time is lost to changeovers and materials handling.
(True/False)
5.0/5
(87)
Relative to product layouts,process layouts are less vulnerable to changes in product mix or new marketing strategies and are therefore more flexible.
(True/False)
4.8/5
(74)
Table 9.5
Union Fork, Inc. has five distribution centers located at the location
coordinates given as follows. The demand at each center is also given.
DC Coordinates Demand A (2,4) 10 B (6,2) 15 C (4,10) 25 D (13,4) 30 E (10,5) 20
-Use the information in Table 9.5.Assume that two plants,rather than one,are to be located.Plant 1 serves distribution centers A,B,and C.Plant 2 serves distribution centers D and E.What is the center of gravity for plant 1?
(Multiple Choice)
4.8/5
(94)
Which one of the following statements about product layout is best?
(Multiple Choice)
4.9/5
(70)
Which of the following is NOT a question that managers must answer before making decisions regarding physical arrangements?
(Multiple Choice)
4.7/5
(76)
This clustering of competing firms can create an industrial ecosystem whereby facilities exchange or transfer wastes,recycle materials,and use each other's byproducts.
(True/False)
4.7/5
(63)
Table 9.17
The Pennsylvania Appliance company is installing an assembly line to produce vacuum cleaners, and you, as an operations manager, are responsible for balancing the line. The work elements to be performed are listed, along with their items and immediate predecessors.
Work Element Time (sec) Immediate Predecessor(s) 60 -- 40 30 20 40 60 70 50 , 20 60 ,
-Use the information in Table 9.17.What is the efficiency of the longest work-element time solution just found?
(Multiple Choice)
4.7/5
(86)
A process layout is a layout in which workstations or departments are arranged in a linear path.
(True/False)
4.9/5
(78)
Table 9.2
Durham Toy, Inc. has five distribution centers at the location coordinates
given as follows. The monthly demand at each center is also given.
Coordinates Demand (10,12) 40 (25,30) 25 (8,15) 30 (11,20) 10 (25,6) 20
-Use the information in Table 9.2.If the plant is located at A,what is the total load-distance score,assuming rectilinear distance?
(Multiple Choice)
4.9/5
(98)
What are four major questions that must be addressed as part of a layout planning effort?
(Essay)
4.9/5
(79)
This clustering of non-competing firms can create a(n)________ whereby facilities exchange or transfer wastes,recycle materials,and use each other's by products.
(Short Answer)
4.8/5
(79)
Fun Vehicles,Inc.makes "beach buggies" on an assembly line.The total productive time to make one buggy is 300 seconds.The current line has a 90-second cycle time and consists of four workstations.The balance delay of this line must be
(Multiple Choice)
4.9/5
(92)
Kiddie Clothes wishes to locate its warehouse so that it would serve its four different stores,described as follows.Based on the center of gravity,what are the x- and y-coordinates of the proposed warehouse location?
Store Trips/Day 1 4 5 2 2 1 4 3 2 3 2 3
(Multiple Choice)
4.9/5
(64)
Showing 181 - 200 of 217