Question 21
Multiple Choice
Which of the following statements regarding Wheeled Coach is FALSE?
Question 22
True/False
The time-phased product structure,unlike the bill of material,adds the concept of lead times.
Question 23
Short Answer
A(n)________ provides feedback to the capacity plan,master production schedule,and production plan so planning can be kept valid at all times.
Question 24
Multiple Choice
Which of the following statements best compares modular bills and phantom bills?
Question 25
True/False
"Phantom bills" are bills of material for subassemblies that do not exist in reality.
Question 26
True/False
MRP is an excellent tool for scheduling components with variable lead times.
Question 27
Essay
(a)Consider the product structure shown below.Assuming 1 A is to be made,how many units of each of the other items would need to be made? (b)If there are 20 of every item except A in on-hand inventory,how many As can be assembled?
Question 28
Essay
Consider the following requirements for a certain product.
Beginning inventory = 500 units Setup cost = $500 per setup Lead time = 1 week Holding cost = $3 per unit per week a.Develop the lot-for-lot MRP table. b.Calculate the total relevant costs.
Question 29
Essay
You have seen several methods for lot sizing in MRP.Why is lot sizing important in MRP? Can too much concern be given to lot sizing?
Question 30
Multiple Choice
An order for 110 units of Product M has been placed.There are currently 30 units of Product M on hand.Each M requires 4 units of Component N.There are 20 units of N on hand.What are the net requirements for N?