Exam 15: Short-Term Scheduling

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

In the sequence of decisions that affect scheduling,________ is (are)the immediate follower(s)of the master schedule (or master production schedule).

Free
(Essay)
4.7/5
(79)
Correct Answer:
Verified

short-term schedules

________ uses computerized short-term scheduling to overcome the disadvantages of rule-based systems by providing the user with interactive computing and graphical output.

Free
(Essay)
4.8/5
(77)
Correct Answer:
Verified

Finite capacity scheduling

Given the following chart of jobs assigned with Johnson's rule,suppose that all the jobs (A,B,C,etc)could be evenly divided into two tasks (such as A1 and A2,B1 and B2,etc).Suppose job B is divided into jobs B1 and B2,each with a body work time of 4.5 hours and a paint time of 2 hours.How much is makespan reduced by this splitting of B? Given the following chart of jobs assigned with Johnson's rule,suppose that all the jobs (A,B,C,etc)could be evenly divided into two tasks (such as A1 and A2,B1 and B2,etc).Suppose job B is divided into jobs B1 and B2,each with a body work time of 4.5 hours and a paint time of 2 hours.How much is makespan reduced by this splitting of B?

Free
(Essay)
4.7/5
(76)
Correct Answer:
Verified

B1 could start on paint at time = 34.5 (1/2 through the completion of B)but E is busy on paint until t = 35,thus B1 will be delayed until t = 35 to start and thus would finish paint at time = 37.B2 could start on paint at time = 39 and would take until t = 41 to finish.Thus makespan is reduced by 2 hours (43 - 41).

An approach to sequencing that can handle the situation where jobs must pass through two or more work centers in a fixed sequence is ________.

(Essay)
4.8/5
(76)

________ cards are used to control the amount of work in a work center,aiding input-output control.

(Essay)
4.8/5
(73)

What are four main criteria by which we evaluate sequencing rules?

(Essay)
4.8/5
(67)

The jobs listed below need to be completed.Assume that it is now day 140.If the jobs are sequenced according to the longest processing time rule,what is the lateness of job A? The jobs listed below need to be completed.Assume that it is now day 140.If the jobs are sequenced according to the longest processing time rule,what is the lateness of job A?

(Multiple Choice)
4.8/5
(71)

There are two jobs to be assigned to two workers.The profit for worker A on job 1 is $5 and on job 2 is $8.The profit for worker B on job 1 is $10 and on job 2 is $12.How should the work be divided using the assignment method?

(Multiple Choice)
4.8/5
(72)

What is the objective of scheduling?

(Multiple Choice)
4.9/5
(76)

Which of the following is a limitation of rules-based dispatching systems?

(Multiple Choice)
4.9/5
(78)

Which critical ratio value implies that a job is already late?

(Multiple Choice)
4.7/5
(91)

Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,what is the optimum sequence of jobs and the minimum time for completion of all jobs? Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,what is the optimum sequence of jobs and the minimum time for completion of all jobs?

(Multiple Choice)
4.9/5
(67)

________ determine the sequence of jobs in process-oriented facilities.

(Essay)
4.9/5
(71)

Gantt charts are useful for scheduling jobs,but not for loading them.

(True/False)
4.8/5
(75)

Machines A,B,C,and D have been in use for several years,while machine E is new.The following table provides data on the value of production of each job when performed on a specific machine. (a)Determine the set of assignments that maximizes production value. (b)What is the total production value of your assignments? (c)Which machine should be retired (i.e. ,gets no assignment)? Machines A,B,C,and D have been in use for several years,while machine E is new.The following table provides data on the value of production of each job when performed on a specific machine. (a)Determine the set of assignments that maximizes production value. (b)What is the total production value of your assignments? (c)Which machine should be retired (i.e. ,gets no assignment)?

(Essay)
4.9/5
(84)

What is the assignment method?

(Essay)
4.8/5
(88)

What is a method of input-output control that uses a system of cards to limit the amount of work at a work center and also to control lead time and monitor backlog?

(Multiple Choice)
4.7/5
(73)

Bob Dresser operates a major appliance warranty service center.His operation has two check stations that are required at the end of every repair task performed by his appliance repair staff.These are the Functionality Review (FR)and the Overall Scan (OS).The FR must be performed successfully before the OS is begun.On Friday morning,six repair jobs are completed,awaiting these two inspection activities.Processing times are given in minutes. Bob Dresser operates a major appliance warranty service center.His operation has two check stations that are required at the end of every repair task performed by his appliance repair staff.These are the Functionality Review (FR)and the Overall Scan (OS).The FR must be performed successfully before the OS is begun.On Friday morning,six repair jobs are completed,awaiting these two inspection activities.Processing times are given in minutes.    a.What is the optimal sequence of jobs for the objective of minimizing the total flow time? b.Show your work,and document the sequence. c.Chart the solution to this problem. d.What jobs are being processed at time period 90? e.What is the total flow time of this problem?   a.What is the optimal sequence of jobs for the objective of minimizing the total flow time? b.Show your work,and document the sequence. c.Chart the solution to this problem. d.What jobs are being processed at time period 90? e.What is the total flow time of this problem? Bob Dresser operates a major appliance warranty service center.His operation has two check stations that are required at the end of every repair task performed by his appliance repair staff.These are the Functionality Review (FR)and the Overall Scan (OS).The FR must be performed successfully before the OS is begun.On Friday morning,six repair jobs are completed,awaiting these two inspection activities.Processing times are given in minutes.    a.What is the optimal sequence of jobs for the objective of minimizing the total flow time? b.Show your work,and document the sequence. c.Chart the solution to this problem. d.What jobs are being processed at time period 90? e.What is the total flow time of this problem?

(Essay)
4.8/5
(79)

Johnson's rule sequences a set of jobs through two different machines or work centers in the same order.

(True/False)
4.8/5
(68)

Given the following chart of jobs assigned with Johnson's rule,suppose that all the jobs (A,B,C,etc)could be evenly divided into two tasks (such as A1 and A2,B1 and B2,etc).Suppose job D is split into two equivalently sized sections,D1 and D2,each with a body work time of 1.5 hours and a paint time of 2 hours (D1 and D2 sum to 3 hours of body work and 4 hours of paint which is equivalent to D).How much is makespan reduced by this splitting of D? Given the following chart of jobs assigned with Johnson's rule,suppose that all the jobs (A,B,C,etc)could be evenly divided into two tasks (such as A1 and A2,B1 and B2,etc).Suppose job D is split into two equivalently sized sections,D1 and D2,each with a body work time of 1.5 hours and a paint time of 2 hours (D1 and D2 sum to 3 hours of body work and 4 hours of paint which is equivalent to D).How much is makespan reduced by this splitting of D?

(Essay)
4.8/5
(84)
Showing 1 - 20 of 116
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)