Exam 10: Program Design

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

In recent years,programmers have increasingly moved away from event-driven programming to more procedural oriented programming languages (like COBOL).

(True/False)
4.8/5
(94)

Program Design

(Multiple Choice)
4.8/5
(60)

Which of the following cohesion types would be considered 'bad' for a program module?

(Multiple Choice)
4.8/5
(78)

In adding implementation references (when converting logical DFDs into physical DFDs)analysts will NOT do which of the following?

(Multiple Choice)
4.8/5
(76)

A module in a structure chart that can be reused is called a 'support module'.

(True/False)
5.0/5
(79)

For a program module on a structure chart,fan-in:

(Multiple Choice)
4.9/5
(72)

The three types of basic processes on a process model:

(Multiple Choice)
4.7/5
(65)

What is a 'top-down approach' and why is it important when designing programs?

(Essay)
4.9/5
(80)

In a car insurance processing structure chart,a control module first calls a module that calculates rates based on age;then it calls a module that calculates rates based on state-of-residency;then it calls a module that calculates rates based on driving record;then calls a module based on health factors;and finally calls a module that combines these factors.This would be an example of a 'transform structure' on a structure chart.

(True/False)
4.9/5
(80)

Every part of a system that is not automated will:

(Multiple Choice)
4.8/5
(69)

The Human-Machine boundary is part of the Human-Computer Interface into usability systems.

(True/False)
4.8/5
(65)

The fifth step in creating a Physical Data Flow Diagram is

(Multiple Choice)
4.8/5
(86)

A diamond on a structure chart shows sequence - like a baseball player would go to first base,then second,third and home.

(True/False)
5.0/5
(76)

As analysts move from logical design to physical design,one of the actions they will do is:

(Multiple Choice)
4.9/5
(87)

Several things must be done by analysts during Program Design.Which of the following is NOT an activity done by analysts during Program Design?

(Multiple Choice)
5.0/5
(86)

Create a structure chart to calculate a student's tuition and fees cost.The cost-per-credit will be in one module (1.2 Determine cost-per-credit);the fees will be in one module (1.3 Determine Fees-costs);and the overall calculation will be in a module (1.4 Calculate Total-cost)

(Essay)
4.9/5
(73)

Processes from logical DFDs might show up on a physical data flow diagram as:

(Multiple Choice)
4.7/5
(75)

In a structure chart,a transaction structure _____.

(Multiple Choice)
4.9/5
(79)

The first step in creating a Physical Data Flow Diagram is

(Multiple Choice)
4.7/5
(87)

A higher-level component that contains the logic for performing other modules (subordinate modules)is known as a control module.

(True/False)
4.7/5
(85)
Showing 81 - 100 of 112
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)