Exam 2: Project Selection and Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Projects can be classified by: size,cost,purpose,length,programming language and hardware platform.

(True/False)
4.8/5
(75)

Kumar is the project manager for a revised TTP system.Which of the following most likely would NOT be considered in developing a work plan?

(Multiple Choice)
4.9/5
(75)

Bob is selecting a systems analysis and design methodology.What might be the first step?

(Multiple Choice)
4.9/5
(79)

__________ are created to ensure that team members are performing tasks in the same way and following the same procedures.

(Multiple Choice)
4.9/5
(82)

In a "typical" business application development using the SDLC,you would probably spend ____ in the planning phase.

(Multiple Choice)
4.8/5
(71)

The V-model is a variation of the Waterfall Methodology that stresses testing.

(True/False)
4.9/5
(82)

CIO is an acronym for "computing information organization".

(True/False)
5.0/5
(85)

The Parallel Methodology breaks the overall project into a series of release versions.

(True/False)
4.9/5
(77)

Using industry standards,the general estimated project time for the Analysis phase is 20%

(True/False)
4.8/5
(74)

A critical success factor for project management is to start with a realistic assessment of the work that needs to be accomplished.

(True/False)
4.8/5
(80)

Parallel methodology is BEST characterized as:

(Multiple Choice)
4.9/5
(80)

Suggestions for motivation might include all of these EXCEPT:

(Multiple Choice)
4.8/5
(77)

The project methodology that takes the longest to complete is Extreme Programming Methodology.

(True/False)
4.7/5
(88)

Using industry standards,the general estimated project time for the Implementation phase is 30%.

(True/False)
4.8/5
(80)

The project methodology that takes the longest to complete is the Waterfall Development Methodology.

(True/False)
4.8/5
(77)

What are some things you can do to avoid conflicts on a project team?

(Essay)
4.8/5
(61)

Why is it generally a problem to add more people to a late project?

(Essay)
4.9/5
(76)

When comparing the Waterfall methodology to the parallel methodology:

(Multiple Choice)
4.9/5
(76)

In today's organizations,an approval committee must review and monitor project progress to ensure project continuance.

(True/False)
4.9/5
(71)

Either systems prototyping or throwaway prototyping are generally a good methodology choice when the project has unclear user requirements.

(True/False)
4.8/5
(75)
Showing 41 - 60 of 110
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)