Exam 7: Moving on to Design

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

What is the purpose of the different layers?

(Essay)
4.9/5
(80)

A value added contract provides for flexibility, but may result in a larger than expected bill.

(True/False)
4.8/5
(77)

Manipulating certain parameters to refine the way features work in a software package is called _____.

(Multiple Choice)
4.9/5
(79)

Some benefits of outsourcing are that the service provider may be more experienced in the technology that would greatly benefit your organization and may have more experienced programmers.

(True/False)
4.8/5
(80)

Enterprise resource planning (ERP) applications are small single-function software packages that are inexpensive and easy to install and have only minor problems and fast, easily recognizable benefits.

(True/False)
4.9/5
(83)

The three primary types of contracts that can be drawn to control the outsourcing deal are (1) a time and arrangements contract, (2) a fixed-price contract, and (3) a value-added contract.

(True/False)
4.9/5
(88)

When using the packaged software design strategy, substantial time can be saved because the project team no longer has to spend time defining the requirements of the new system.

(True/False)
4.9/5
(88)

In the design phase we address the functional requirements.

(True/False)
4.8/5
(61)

Pirate Adventures, Inc., a company that owns and operates hotels in tropical locations, is interested in replacing the 15-year-old room reservation system in all of its hotels. Custom development would be the best design strategy.

(True/False)
4.8/5
(79)

Many project teams believe that packaged software is the best way to create a system because they have complete control over the way the system looks and functions, and they can be flexible and creative in the way they solve business problems.

(True/False)
4.9/5
(78)

To avoid the classic design mistake of "feature creep," the analyst should _____.

(Multiple Choice)
4.8/5
(82)

To avoid the classic design mistake of "silver bullet syndrome," the analyst should _____.

(Multiple Choice)
4.7/5
(80)

The process of building new systems by combining packaged software, existing legacy systems, and new software written to integrate everything together is called _____.

(Multiple Choice)
4.7/5
(67)

Which one in the following is NOT a layer of a software architecture.

(Multiple Choice)
4.8/5
(83)

What is the purpose of an alternatives matrix? What is the typical content? How will this tool be used by a project team in the context of design strategy selection?

(Essay)
5.0/5
(79)

The design phase of the SDLC creates a(n) _____.

(Multiple Choice)
4.9/5
(80)

There are three methods to create a new system. They are _____.

(Multiple Choice)
4.7/5
(75)

In-house experience is not a factor to be considered for selecting a design strategy since a company is always able to hire experienced developers.

(True/False)
4.8/5
(82)

Class such as URLConnection (dealing with URL connections) should be handled in the layer Data Management.

(True/False)
4.8/5
(66)

As many as 70% of companies with IT budgets over $5 million are currently outsourcing development of systems.

(True/False)
4.8/5
(82)
Showing 41 - 60 of 99
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)