Exam 7: Moving on to Design
Exam 1: Introduction to Systems Analysis and Design103 Questions
Exam 2: Project Management157 Questions
Exam 3: Requirements Determination79 Questions
Exam 4: Business Process and Functional Modeling85 Questions
Exam 5: Structural Modeling94 Questions
Exam 6: Behavioral Modeling85 Questions
Exam 7: Moving on to Design99 Questions
Exam 8: Class and Method Design97 Questions
Exam 9: Data Management Layer Design93 Questions
Exam 10: Human Computer Interaction Layer Design80 Questions
Exam 12: Physical Architecture Layer Design74 Questions
Exam 12: Construction79 Questions
Exam 13: Installation and Operations94 Questions
Select questions type
A value added contract provides for flexibility, but may result in a larger than expected bill.
(True/False)
4.8/5
(77)
Manipulating certain parameters to refine the way features work in a software package is called _____.
(Multiple Choice)
4.9/5
(79)
Some benefits of outsourcing are that the service provider may be more experienced in the technology that would greatly benefit your organization and may have more experienced programmers.
(True/False)
4.8/5
(80)
Enterprise resource planning (ERP) applications are small single-function software packages that are inexpensive and easy to install and have only minor problems and fast, easily recognizable benefits.
(True/False)
4.9/5
(83)
The three primary types of contracts that can be drawn to control the outsourcing deal are (1) a time and arrangements contract, (2) a fixed-price contract, and (3) a value-added contract.
(True/False)
4.9/5
(88)
When using the packaged software design strategy, substantial time can be saved because the project team no longer has to spend time defining the requirements of the new system.
(True/False)
4.9/5
(88)
Pirate Adventures, Inc., a company that owns and operates hotels in tropical locations, is interested in replacing the 15-year-old room reservation system in all of its hotels. Custom development would be the best design strategy.
(True/False)
4.8/5
(79)
Many project teams believe that packaged software is the best way to create a system because they have complete control over the way the system looks and functions, and they can be flexible and creative in the way they solve business problems.
(True/False)
4.9/5
(78)
To avoid the classic design mistake of "feature creep," the analyst should _____.
(Multiple Choice)
4.8/5
(82)
To avoid the classic design mistake of "silver bullet syndrome," the analyst should _____.
(Multiple Choice)
4.7/5
(80)
The process of building new systems by combining packaged software, existing legacy systems, and new software written to integrate everything together is called _____.
(Multiple Choice)
4.7/5
(67)
Which one in the following is NOT a layer of a software architecture.
(Multiple Choice)
4.8/5
(83)
What is the purpose of an alternatives matrix? What is the typical content? How will this tool be used by a project team in the context of design strategy selection?
(Essay)
5.0/5
(79)
There are three methods to create a new system. They are _____.
(Multiple Choice)
4.7/5
(75)
In-house experience is not a factor to be considered for selecting a design strategy since a company is always able to hire experienced developers.
(True/False)
4.8/5
(82)
Class such as URLConnection (dealing with URL connections) should be handled in the layer Data Management.
(True/False)
4.8/5
(66)
As many as 70% of companies with IT budgets over $5 million are currently outsourcing development of systems.
(True/False)
4.8/5
(82)
Showing 41 - 60 of 99
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)