Exam 13: Budgeting and Standard Cost Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The cash collections from accounts receivable in November are

(Multiple Choice)
4.7/5
(91)

An unfavorable cost variance occurs when budgeted cost at actual volumes exceeds actual cost.

(True/False)
4.9/5
(88)

The following data relate to direct materials costs for November: The following data relate to direct materials costs for November:    -What is the direct materials quantity variance? -What is the direct materials quantity variance?

(Multiple Choice)
4.8/5
(87)

If the standard to produce a given amount of product is 500 direct labor hours at $15 and the actual was 600 hours at $17,the rate variance was $1,200 favorable.

(True/False)
4.8/5
(72)

Compute the standard cost for one hat,based on the following standards for each hat: Compute the standard cost for one hat,based on the following standards for each hat:

(Essay)
4.8/5
(87)

Standard and actual costs for direct labor for the manufacture of 1,000 units of product were as follows: Standard and actual costs for direct labor for the manufacture of 1,000 units of product were as follows:     Determine the (a)time variance, (b)rate variance,and (c)total direct labor cost variance. Determine the (a)time variance, (b)rate variance,and (c)total direct labor cost variance.

(Essay)
4.9/5
(77)

The difference between the standard cost of a product and its actual cost is called a variance.

(True/False)
4.9/5
(86)

If the actual quantity of direct materials used in producing a commodity differs from the standard quantity,the variance is termed

(Multiple Choice)
4.8/5
(81)

Using a standard costing system for nonmanufacturing expenses is easily administered because the expenses generally relate to a repetitive,measurable output.

(True/False)
4.7/5
(85)

The following data is given for the Walker Company: The following data is given for the Walker Company:   Overhead is applied on standard labor hours. The factory overhead controllable variance is Overhead is applied on standard labor hours. The factory overhead controllable variance is

(Multiple Choice)
4.7/5
(77)

The most effective means of presenting standard factory overhead cost variance data is through a factory overhead cost budget.

(True/False)
4.7/5
(84)

The cash budget summarizes future plans for acquisition of fixed assets.

(True/False)
4.8/5
(82)

The standard price and quantity of direct materials are separated because

(Multiple Choice)
4.8/5
(82)

The standard factory overhead rate is $7.50 per machine hour ($6.20 for variable factory overhead and $1.30 for fixed factory overhead)based on 100% capacity of 80,000 machine hours.The standard cost and the actual cost of factory overhead for the production of 15,000 units during August were as follows: The standard factory overhead rate is $7.50 per machine hour ($6.20 for variable factory overhead and $1.30 for fixed factory overhead)based on 100% capacity of 80,000 machine hours.The standard cost and the actual cost of factory overhead for the production of 15,000 units during August were as follows:   What is the amount of the fixed factory overhead volume variance? What is the amount of the fixed factory overhead volume variance?

(Multiple Choice)
4.8/5
(69)

Production and sales estimates for June are as follows: Production and sales estimates for June are as follows:   The number of units expected to be manufactured in June is The number of units expected to be manufactured in June is

(Multiple Choice)
4.7/5
(72)

Standards that represent levels of operation that can be attained with reasonable effort are called

(Multiple Choice)
4.7/5
(78)

A budget procedure that provides for the maintenance at all times of a twelve-month projection into the future is called continuous budgeting.

(True/False)
4.8/5
(89)

The budget process involves doing all the following EXCEPT

(Multiple Choice)
4.8/5
(76)

The capital expenditures budget summarizes future plans for acquisition of fixed assets.

(True/False)
4.7/5
(77)

The budgeted volume of production is based on the sum of (1)the expected sales volume and (2)the desired ending inventory,less (3)the estimated beginning inventory.

(True/False)