Exam 8: Flexible Budgets,variances,and Management Control: II

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Managers should use unitized fixed manufacturing overhead costs for planning and control.

(True/False)
4.8/5
(79)

Can the variable overhead efficiency variance a.be computed the same way as the efficiency variance for direct-cost items? b.be interpreted the same way as the efficiency variance for direct-cost items? Explain.

(Essay)
4.9/5
(95)

Financial measures of performance include

(Multiple Choice)
5.0/5
(82)

All Clean of Alberta manufactures individual shampoos for hotel/motel clientele.The fixed manufacturing overhead costs for 2016 will total $576,000.The company uses good units finished for fixed overhead allocation and anticipates 300,000 units of production.Good units finished average 92 percent of total units produced.During January,20,000 units were produced.Actual fixed overhead cost per good unit averaged $2.82 in January. Required: a.Determine the fixed overhead rate for 2016. b.Determine the fixed overhead static-budget variance for January. c.Determine the fixed overhead production-volume variance for January. d.Determine the fixed overhead rate variance for January.

(Essay)
4.7/5
(71)

Use the information below to answer the following question(s). Moeller Electric manufactures light fixtures.The following information pertains to the company's manufacturing overhead data. Use the information below to answer the following question(s). Moeller Electric manufactures light fixtures.The following information pertains to the company's manufacturing overhead data.    -What is Moeller Electric's variable manufacturing overhead static-budget variance? -What is Moeller Electric's variable manufacturing overhead static-budget variance?

(Multiple Choice)
4.9/5
(93)

Briefly explain why a favourable variable overhead rate variance may not always be desireable.

(Essay)
4.8/5
(74)

Use the information below to answer the following question(s). Michelle Inc.uses a level 4-variance analysis of its manufacturing overhead costs,and has the following results for April. A.Budgeted direct labour-hours per unit is used to allocate variable manufacturing overhead. Fixed overhead is allocated on a per unit basis. B.Budgeted amounts for April are: Use the information below to answer the following question(s). Michelle Inc.uses a level 4-variance analysis of its manufacturing overhead costs,and has the following results for April. A.Budgeted direct labour-hours per unit is used to allocate variable manufacturing overhead. Fixed overhead is allocated on a per unit basis. B.Budgeted amounts for April are:    C.Actual amounts for April are:    -What is the variable manufacturing overhead efficiency variance? C.Actual amounts for April are: Use the information below to answer the following question(s). Michelle Inc.uses a level 4-variance analysis of its manufacturing overhead costs,and has the following results for April. A.Budgeted direct labour-hours per unit is used to allocate variable manufacturing overhead. Fixed overhead is allocated on a per unit basis. B.Budgeted amounts for April are:    C.Actual amounts for April are:    -What is the variable manufacturing overhead efficiency variance? -What is the variable manufacturing overhead efficiency variance?

(Multiple Choice)
4.9/5
(93)

If Pope Inc.uses standard costing,the overhead allocated to work-in-process is recorded as a

(Multiple Choice)
4.7/5
(78)

What are the arguments for prorating a production-volume variance that has been deemed to be material among work-in-process,finished goods,and cost of goods sold,as opposed to writing it all off to cost of goods sold?

(Essay)
4.8/5
(84)

Which option(s)would be consistent with the proration approach for end-of-period adjustments when the underallocated or overallocated variable overhead costs are significant?

(Multiple Choice)
4.9/5
(85)

An unfavourable fixed setup overhead rate variance could be due to higher lease costs of new setup equipment or higher salaries paid to engineers and supervisors.

(True/False)
4.7/5
(77)

Answer the following question(s)using the information below. Munoz Inc.produces a special line of plastic toy racing cars in batches.To manufacture a batch of the cars Munoz Inc.must setup the machines and molds.Setup costs are batch-level costs because they are associated with batches rather than individual units of products.A separate Setup Department is responsible for setting up machines and molds for different styles of car. Setup overhead costs consist of some costs that are variable and some costs that are fixed with respect to the number of setup hours.The following information pertains to June 2012: Answer the following question(s)using the information below. Munoz Inc.produces a special line of plastic toy racing cars in batches.To manufacture a batch of the cars Munoz Inc.must setup the machines and molds.Setup costs are batch-level costs because they are associated with batches rather than individual units of products.A separate Setup Department is responsible for setting up machines and molds for different styles of car. Setup overhead costs consist of some costs that are variable and some costs that are fixed with respect to the number of setup hours.The following information pertains to June 2012:    -Calculate the rate variance for fixed setup overhead costs. -Calculate the rate variance for fixed setup overhead costs.

(Multiple Choice)
4.8/5
(82)

A favourable variable manufacturing overhead efficiency variance may be interpreted as meaning which of the following if machine hours are the cost allocation base?

(Multiple Choice)
4.9/5
(88)

When the actual output is more than expected and the volume is unusually high then the production volume variance is

(Multiple Choice)
4.8/5
(58)

If budgeted machine-hours allowed per actual output unit equals 1.0 hour,and budgeted variable manufacturing overhead per machine-hour is $200,what is the budgeted variable manufacturing overhead rate per output unit?

(Multiple Choice)
4.9/5
(73)

Both financial and nonfinancial performance measures are key inputs when evaluating the performance of managers.

(True/False)
4.7/5
(77)

The fixed manufacturing overhead efficiency variance is used to analyze overhead costs.

(True/False)
4.8/5
(84)

Answer the following question(s)using the information below. Jenny's Corporation manufactured 25,000 grooming kits for horses during March.The fixed-overhead cost allocation rate is $20.00 per machine-hour.The following fixed overhead data pertain to March: Answer the following question(s)using the information below. Jenny's Corporation manufactured 25,000 grooming kits for horses during March.The fixed-overhead cost allocation rate is $20.00 per machine-hour.The following fixed overhead data pertain to March:    -What is the fixed overhead rate variance? -What is the fixed overhead rate variance?

(Multiple Choice)
4.8/5
(71)

Answer the following question(s)using the information below. Munoz Inc.produces a special line of plastic toy racing cars in batches.To manufacture a batch of the cars Munoz Inc.must setup the machines and molds.Setup costs are batch-level costs because they are associated with batches rather than individual units of products.A separate Setup Department is responsible for setting up machines and molds for different styles of car. Setup overhead costs consist of some costs that are variable and some costs that are fixed with respect to the number of setup hours.The following information pertains to June 2012: Answer the following question(s)using the information below. Munoz Inc.produces a special line of plastic toy racing cars in batches.To manufacture a batch of the cars Munoz Inc.must setup the machines and molds.Setup costs are batch-level costs because they are associated with batches rather than individual units of products.A separate Setup Department is responsible for setting up machines and molds for different styles of car. Setup overhead costs consist of some costs that are variable and some costs that are fixed with respect to the number of setup hours.The following information pertains to June 2012:    -Calculate the production-volume variance for fixed setup overhead costs. -Calculate the production-volume variance for fixed setup overhead costs.

(Multiple Choice)
4.7/5
(83)

Managers have found that non-financial measures provide useful information for their planning and control decisions.

(True/False)
4.8/5
(92)
Showing 101 - 120 of 148
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)