Exam 12: Lean Principles, Lean Accounting, and Activity Analysis

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is are objectives of lean manufacturing?

(Multiple Choice)
4.9/5
(91)

In a lean system, there are fewer transactions to record than there are in a traditional system.

(True/False)
4.9/5
(78)

From the above schedule of activity costs, determine the prevention costs.

(Multiple Choice)
4.9/5
(71)

Which of the following is best suited to providing timely and focused performance information?

(Multiple Choice)
4.9/5
(73)

Costs of controlling quality include prevention costs and internal failure costs.

(True/False)
5.0/5
(75)

Make-to-order companies typically produce in small batch sizes.

(True/False)
4.9/5
(71)

In a lean environment, operations only respond to customer orders.

(True/False)
4.8/5
(81)

Lean manufacturing favors organizing work around products rather than around processes.

(True/False)
4.7/5
(95)

Costs of failing to control quality include prevention costs and external failure costs.

(True/False)
4.9/5
(88)

In a push manufacturing system, raw materials are released to production based on forecasted demand.

(True/False)
4.8/5
(75)

Long setups and large batch sizes result in smaller inventories.

(True/False)
4.7/5
(91)

Christmas Express makes wreaths in batch sizes of 12.The cutting & assembly process takes 8 minutes per wreath and the decorating process time is 10 minutes per wreath.It takes 12 minutes to move the wreaths from the cutting & assembly process to the decorating process. a Compute the value-added, non-value-added, and the total lead time of the wreath process. b Compute the value-added ratio.Round to the nearest decimal.

(Essay)
4.8/5
(83)

From the foregoing information, determine the production costs transferred to Finished Goods during August.

(Multiple Choice)
4.8/5
(70)

By spending more in costs of controlling quality, the costs of failing to control quality will decrease.

(True/False)
4.8/5
(79)

Identity the following by their type of quality cost. -Warranty work

(Multiple Choice)
4.9/5
(77)

Which of the following results in fewer transactions in lean accounting?

(Multiple Choice)
5.0/5
(74)

A local college is aggressively working to reduce the time it takes students to enroll for each semester.Which of the following changes would not help achieve this goal?

(Multiple Choice)
4.8/5
(70)

Which of the following is not a prevention cost?

(Multiple Choice)
4.9/5
(84)

Identity the following by their type of quality cost. -Scrap

(Multiple Choice)
4.8/5
(78)

From the above schedule of activity costs, determine the non-value-added costs.

(Multiple Choice)
4.9/5
(77)
Showing 81 - 100 of 137
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)