In a job costing system the cost object is a job.

(True/False)
4.8/5
(80)

Which of these is not an uncertainty in measuring job costs?

(Multiple Choice)
4.9/5
(98)

Inspection for spoilage should always be carried out at the end of the production process and not at an earlier period.

(True/False)
4.8/5
(88)

The balance of overhead over or under applied for the period, if it is a material amount:

(Multiple Choice)
4.8/5
(72)

The following information is available for product K87. The following information is available for product K87.   The cost of a job for 1,500 units of product K87, which uses 33 machine hours, is: The cost of a job for 1,500 units of product K87, which uses 33 machine hours, is:

(Multiple Choice)
4.9/5
(74)

Abnormal spoilage costs generally appear in the external financial accounts

(Multiple Choice)
4.9/5
(71)

Inventoriable product costs consist of manufacturing and non-manufacturing costs.

(True/False)
4.8/5
(84)

Generally all the costs assigned to a job are incremental, i.e. they would not be incurred if the job was not done.

(True/False)
4.8/5
(85)

Under a job costing system rework costs are often not tracked.

(True/False)
4.7/5
(80)

The way spoilage is handled in the accounting records depends on whether the spoilage is considered normal or abnormal.

(True/False)
4.9/5
(82)

The actual allocation rate under a job costing system is; actual overhead cost divided by actual quantity of allocation base.

(True/False)
4.9/5
(77)

Tulip uses a job costing system that allocates overhead as a percentage of direct labour costs. The budget for this year was; direct materials $60,000, direct labour $30,000, overhead $45,000. The actual costs for this year were; direct materials $50,000, direct labour $35,000, overhead $45,000. How much overhead was over/under allocated?

(Multiple Choice)
4.8/5
(75)

In a job costing system the accounting entry to record the payment of factory wages for the month is:

(Multiple Choice)
4.8/5
(82)

Chloes Sportswear manufactures a specialty line of mini skirts using a job order cost system. During June, the following costs were incurred in completing Job F28: direct materials $12,700; direct labour $3,200; non-factory administrative costs $1,200; and selling costs $5,600. Factory overhead was applied at the rate of $8.60 per machine hour and Job F28 required 190 machine hours. If Job F28 resulted in 1300 good mini skirts, the cost of goods sold per unit would be

(Multiple Choice)
4.8/5
(70)

The cost credited to the work in process account and debited to the finished good account is known as:

(Multiple Choice)
4.8/5
(85)

In a job costing system the accounting entry made at the time job 664 is delivered to the customer is:

(Multiple Choice)
5.0/5
(77)

The cost of normal spoilage arising from the requirements of a specific job:

(Multiple Choice)
4.8/5
(89)

In job costing the allocation of overhead results in a debit to:

(Multiple Choice)
4.8/5
(74)

The true statement is:

(Multiple Choice)
4.9/5
(70)

Fixed and variable overhead costs are combined in one cost pool.

(True/False)
4.9/5
(93)