Exam 14: Managing Projects
Exam 1: Introduction to Operations and Supply Chain Management83 Questions
Exam 2: Operations and Supply Chain Strategies85 Questions
Exam 3: Process Choice and Layout Decisions in Manufacturing and Services100 Questions
Exam 4: Business Processes83 Questions
Exam 5: Managing Quality66 Questions
Exam 6: Managing Capacity71 Questions
Exam 6: S: Advanced Waiting Line Theory and Simulation Modeling70 Questions
Exam 7: Supply Management92 Questions
Exam 8: Logistics90 Questions
Exam 9: Forecasting79 Questions
Exam 10: Sales and Operations Planning Aggregate Planning80 Questions
Exam 11: Managing Inventory Throughout the Supply Chain78 Questions
Exam 12: Managing Production Across the Supply Chain96 Questions
Exam 12: S: Supply Chain Information Systems62 Questions
Exam 13: Jitlean Production75 Questions
Exam 14: Managing Projects65 Questions
Exam 15: Developing Products and Services88 Questions
Select questions type
Program evaluation and review technique, PERT, is a network-based technique in which there are multiple time estimates for each activity.
(True/False)
4.7/5
(71)
The earliest start time of an activity is dependent on the earliest finish time of its immediate predecessors.
(True/False)
4.9/5
(87)
A project is a temporary undertaking designed to create a unique, product, service or results.
(True/False)
4.9/5
(77)
One of the primary characteristics of projects as a form of work is the movement of personnel from project to project.
(True/False)
5.0/5
(69)
The tablet unearthed by the archaeologist revealed an ancient culture's project plan. However, the sands of time had erased much of the information that the table once contained. Use this fragmentary record to unlock the ancient project's secrets and answer the following question(s).
Activity Predecessors Time ES EF LS LF A \@cdots 7 12 B \@cdots 8 C A 13 20 D A 11 12 E B 14 17 F B 11 G D, E 6 H C 20 K F 29 L G,H,K 9
-Refer to the scenario above. The project's duration is:
(Multiple Choice)
4.8/5
(84)
A(n)________ is a graphical tool used to show a project's progress as time elapses.
(Short Answer)
4.9/5
(77)
The university president concocts a thirteen-step sinister plan to lower morale to zero during his last year in office. The duration of each step (in days)and the required predecessor(s)are displayed in the table.
Activity Duration Predecessor A 3 -\cdot B 8 \@cdots C 8 A D 7 B E 4 B F 4 C,D G 8 C,D H 8 E I 4 F J 2 G K 6 H L 10 I M 7 , What are the early and late start and finish times for this morale-lowering project?
(Essay)
4.9/5
(86)
Key points in a project, such as when a major activity or phase should be completed, are referred to as lodestones.
(True/False)
4.8/5
(87)
Performance or time targets for each major group of activities in a project are set during the planning phase of a project.
(True/False)
4.8/5
(88)
The university president concocts a thirteen-step sinister plan to lower morale to zero during his last year in office. The duration of each step (in days)and the required predecessor(s)are displayed in the table.
Activity Duration Predecessor A 3 - B 8 - 8 A 7 B 4 4 , , 8 8 4 2 6 10 I, K
-Identify the activities that have slack and the amount of slack each has for this morale-lowering project?
(Essay)
4.9/5
(75)
Which of these needs does the Guide to the Project Management Body of Knowledge NOT serve?
(Multiple Choice)
4.9/5
(76)
A hatmaker, fresh off a very successful showing at Lidzapalooza is excited about the prospects of providing the finest chapeaus to meet the needs of his energized customer base in the coming year. He and his space designer have identified seven activities that are necessary to expand his small shop. For the sake of simplicity, and to avoid giving away any trade secrets, the activities have been identified by letters A-G. The activities, their time estimates, and the precedence requirements are listed in the table immediately below. Use this scenario to answer the following question(s).
Activity Predecessors Time (weeks) A - 7 B A 6 C A 10 D C 12 E B, C 5 F D, E 11 G F 8
-Refer to the scenario above. Which of these statements is BEST?
(Multiple Choice)
5.0/5
(94)
Construction of the cattery could be distilled to eight distinct steps, from the official groundbreaking ceremony to the cutting of the litterbox ribbon. The activities, their durations and predecessors are shown in the table below. Use this scenario to answer the following question(s).
Activity Predecessors Time (weeks) A \@cdots 10 B A 8 C A 7 D C 11 E D 12 F B 11 G E, F 6 H E, F 9
-Refer to the scenario above. Which of these activities has the least slack?
(Multiple Choice)
4.8/5
(83)
What is the latest that activity D can start if A lasts 5 days, B lasts 7 days, C lasts 4 days, D lasts 5 days, E lasts 7 days, and F is 6 days long? 
(Multiple Choice)
4.9/5
(81)
A project is composed of 6 activities that have durations and precedence requirements shown in the table. Which of these activities is NOT on the critical path? Activity Length Predecessor A 5 \@cdots B 7 A C 4 A D 7 B,C E 7 B F 6 D, E
(Multiple Choice)
4.8/5
(89)
The tablet unearthed by the archaeologist revealed an ancient culture's project plan. However, the sands of time had erased much of the information that the table once contained. Use this fragmentary record to unlock the ancient project's secrets and answer the following question(s).
Activity Predecessors Time ES EF LS LF A \@cdots 7 12 B \@cdots 8 C A 13 20 D A 11 12 E B 14 17 F B 11 G D, E 6 H C 20 K F 29 L G,H,K 9
-Refer to the scenario above. What is the latest start time for activity K?
(Multiple Choice)
4.7/5
(80)
In what way are projects and typical business activities similar?
(Multiple Choice)
4.9/5
(83)
Given the earliest and latest finish times for each of these activities, what are the activity lengths?
Activity EF LF Predecessors A 3 3 \@cdots B 10 10 A C 5 13 A D 18 18 B E 15 18 B F 11 19 C G 8 19 C H 23 23 D, E I 15 23 F, G J 24 24 H, I
(Essay)
4.9/5
(76)
A Gantt chart provides both a planning function and a control function.
(True/False)