Exam 21: Statistical Process Control
Exam 1: What Is Statistics46 Questions
Exam 2: Graphical Descriptive Techniques 194 Questions
Exam 3: Graphical Descriptive Techniques 2156 Questions
Exam 4: Numerical Descriptive Techniques275 Questions
Exam 5: Data Collection and Sampling84 Questions
Exam 6: Probability240 Questions
Exam 7: Random Variables and Discrete Probability Distributions283 Questions
Exam 8: Continuous Probability Distributions224 Questions
Exam 9: Sampling Distributions156 Questions
Exam 10: Introduction to Estimation154 Questions
Exam 11: Introduction to Hypothesis Testing189 Questions
Exam 12: Inference About a Population153 Questions
Exam 13: Inference About Comparing Two Populations170 Questions
Exam 14: Analysis of Variance157 Questions
Exam 15: Chi-Squared Tests179 Questions
Exam 16: Simple Linear Regression and Correlation304 Questions
Exam 17: Multiple Regression160 Questions
Exam 18: Model Building148 Questions
Exam 19: Nonparametric Statistics175 Questions
Exam 20: Time-Series Analytics and Forecasting225 Questions
Exam 21: Statistical Process Control140 Questions
Exam 22: Decision Analysis123 Questions
Exam 23: Conclusion47 Questions
Select questions type
Which of the following is an example of chance variation in a process?
(Multiple Choice)
4.9/5
(70)
Assume a process has limits set at ±2.5 standard errors from the centerline.The average run length (ARL)is 81.What does this mean?
(Essay)
4.8/5
(84)
In designing a control chart,the statistician must select a sample size and a sampling frequency.These decisions are based on which factors:
(Multiple Choice)
4.8/5
(79)
When the purpose of sampling is to detect when a process becomes too variable,the control chart of choice will be an S chart.
(True/False)
4.8/5
(75)
Describe what a Type I error is,and what its impact is,in terms of a production process.
(Essay)
4.8/5
(90)
Discuss what we mean by assignable variation in a process and give an example.
(Essay)
4.8/5
(77)
25 Samples Production
25 samples of size 4 were taken from a manufacturing process.The mean of the sample means and the pooled standard deviation are
,and S = 3.5,respectively.The sample means are listed below.
-{25 Samples Production Narrative} Is the process under control? Discuss.
(Essay)
4.8/5
(80)
To construct a
chart,estimate the mean of the process distribution using the mean of the sample means,denoted by: ____________________.
(Essay)
5.0/5
(76)
Diaper Delivery
Wrap-M-Up,a Ft.Lauderdale diaper Service,has 10 delivery men who each deliver diapers to 50 customers every day.Wrap-M-Up decides to record the proportion of diapers delivered on time for a 10-day period and construct a p chart to see whether the proportion is too erratic.The data are shown below:
-{Diaper Delivery Narrative} Find the numerical value of the upper control limit for the p chart.
(Short Answer)
4.8/5
(76)
Chance variation was built into the produce when the production process was first set up.
(True/False)
4.9/5
(89)
If a p chart finds fourteen sample proportions in a row that alternate up and down,this could be an example of assignable cause variation called a(n)____________________.
(Short Answer)
4.9/5
(81)
Sample proportions that are ____________________ than the lower control limit of a p chart indicate a change in the process that we would like to keep.
(Short Answer)
4.7/5
(81)
Suppose you are producing a product implementing statistical process control.
a.Give an example of assignable variation that would create a level shift.
b.Give an example of assignable variation that would create instability.
c.Give an example of assignable variation that would create a trend.
d.Give an example of assignable variation that would create a cycle.
(Essay)
4.7/5
(73)
A new machine can cause a change in the mean of a process distribution.This is a result of a level shift.
(True/False)
4.9/5
(69)
If a control chart finds the standard deviation in the means is increasing,this could be an indicator of assignable variation called ____________________.
(Short Answer)
4.9/5
(71)
If a control chart finds fourteen points in a row that are alternating up and down,this is an example of assignable variation called a(n)____________________.
(Short Answer)
5.0/5
(72)
For an
chart,the lower and upper control limits are usually set at three standard errors from the centerline.
(True/False)
4.8/5
(95)
If the lower control limit for the p chart is negative,we set it equal to
(Multiple Choice)
4.9/5
(76)
To determine whether the proportion of defectives is in line with specifications,we use a(n):