Exam 13: Managing Production Across the Supply Chain
Exam 1: Introduction to Operations and Supply Chain Management62 Questions
Exam 2: Operations and Supply Chain Strategies57 Questions
Exam 3: Process Choice and Layout Decisions in Manufacturing and Services67 Questions
Exam 4: Business Processes71 Questions
Exam 5: Managing Quality58 Questions
Exam 6: Managing Capacity60 Questions
Exam 7: S Advanced Waiting Line Theory and Simulation Modeling49 Questions
Exam 8: Supply Management67 Questions
Exam 9: Logistics64 Questions
Exam 10: Forecasting55 Questions
Exam 11: Sales and Operations Planning Aggregate Planning55 Questions
Exam 12: Managing Inventory Throughout the Supply Chain54 Questions
Exam 13: Managing Production Across the Supply Chain56 Questions
Exam 14: S Supply Chain Information Systems39 Questions
Exam 15: Jitlean Production51 Questions
Exam 16: Managing Projects56 Questions
Exam 17: Developing Products and Services60 Questions
Select questions type
Material requirements planning is performed over a shorter time frame and greater level of detail than master scheduling.
(True/False)
4.8/5
(80)
Distribution requirements planning is used to synchronize supply chain partners at the production activity control level.
(True/False)
4.8/5
(84)
MRP nervousness refers to the notion that a small change at the top of a bill of material can have drastic effects on items farther down the bill of material.
(True/False)
4.8/5
(88)
Consider the product structure tree shown below:
-With a beginning inventory of zero for all components and finished items,how many assembly Es are needed to produce 20 product Xs?
(Multiple Choice)
4.8/5
(81)
Describe the scope,inputs,and outputs of sales and operations planning,master scheduling,and MRP.
(Essay)
5.0/5
(78)
Available to promise inventory is always zero for the first week in the master schedule record.
(True/False)
4.8/5
(81)
The planning technique that uses the master production schedule to monitor key resource requirements is:
(Multiple Choice)
4.9/5
(79)
Explain in layman's terms all of the information that is provided by a master schedule.
(Essay)
4.8/5
(76)
Material requirements planning is used to manage independent demand inventory.
(True/False)
4.9/5
(76)
Using this MRP record and a lead time of 3 weeks,what should the planned orders be in week 1? 
(Multiple Choice)
4.9/5
(64)
In material requirements planning,units already on order are referred to as ________ receipts and new orders are termed ________ receipts.
(Short Answer)
4.9/5
(77)
Distribution requirements planning is identical to material requirements planning except instead of gross requirements,a DRP record shows forecasted demand.
(True/False)
4.8/5
(68)
RFID tags can be used instead of a bar code system to trace the movement and location of materials.
(True/False)
4.9/5
(67)
From a revenue standpoint,a producer would rather have higher forecasted demand than booked orders.
(True/False)
4.9/5
(76)
A unit that is not been sold or otherwise committed to any other customer should be considered available to promise.
(True/False)
4.9/5
(77)
Forecasts in a company using a distribution requirements planning system are typically based on:
(Multiple Choice)
4.8/5
(83)
Consider the product structure tree shown below:
-Assume that the company using this product structure tree has 5 items each at the 0 level,10 items each at the 1 level and 20 items each at the 2 level.How many units of A,B,and E will the company need to acquire in order to ship an order of 20 X's?
(Essay)
4.9/5
(84)
________ translates the master schedule for final products into detailed requirements.
(Short Answer)