Exam 9: Database Design

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A is an information system component that handles a specific business function, such as inventory, orders, or payroll.

(Short Answer)
4.9/5
(77)

The advent of very sophisticated application generators and has substantially decreased coding and testing time.

(Short Answer)
4.9/5
(73)

The database contents might be loaded interactively or in batch mode using a variety of methods and devices including customized user programs.

(True/False)
4.8/5
(81)

What are the factors affecting the purchasing decision for DBMS software?

(Essay)
4.8/5
(83)

The primary objective in database design is to create complete, normalized, nonredundant, and fully integrated conceptual, logical, and physical database models.

(True/False)
4.8/5
(88)

The testing and evaluation phase of the Database Life Cycle (DBLC) occurs after applications programming.

(True/False)
4.7/5
(85)

The database initial study phase of the Database Life Cycle (DBLC) involves .

(Multiple Choice)
4.8/5
(67)

allows the assignment of access rights to specific authorized users.

(Short Answer)
4.8/5
(81)

Producing the required information flow is part of the phase of the Database Life Cycle (DBLC).

(Multiple Choice)
4.7/5
(80)

There are stages in the Database Life Cycle (DBLC).

(Multiple Choice)
4.7/5
(78)

is the first stage in the database design process.

(Short Answer)
4.8/5
(71)

is the process that establishes the need for, and the extent of, an information system.

(Short Answer)
4.7/5
(79)

The feasibility study during the planning phase of the Systems Development Life Cycle (SDLC) must address the:

(Multiple Choice)
4.9/5
(80)

The initial assessment and the feasibility study are part of the Systems Development Life Cycle's (SDLC's) ? phase.

(Multiple Choice)
4.9/5
(83)

The maintenance and evolution phase of the Database Life Cycle (DBLC) involves .

(Multiple Choice)
4.8/5
(77)

Decentralized design is typical of relatively simple, small databases and can be successfully done by a single person.

(True/False)
4.7/5
(81)

A system maintenance activity generated in response to changes in the business environment is referred to as corrective maintenance.

(True/False)
4.8/5
(71)

The Systems Development Life Cycle (SDLC) traces the history of an information system.

(True/False)
4.8/5
(88)

Coding, testing, and debugging are part of the phase of the Systems Development Life Cycle (SDLC).

(Multiple Choice)
4.8/5
(79)

allow end users to access the database without being able to download the information from their workstations.

(Short Answer)
4.9/5
(79)
Showing 41 - 60 of 103
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)