Exam 12: Water Distribution Installation
Exam 1: Plumbers Toolbox29 Questions
Exam 2: Power Tools31 Questions
Exam 3: Types of Pipe31 Questions
Exam 4: Fittings32 Questions
Exam 5: Valves and Devices24 Questions
Exam 6: Fixtures30 Questions
Exam 7: Faucets and Drain Assemblies22 Questions
Exam 8: Plumbing Equipment and Appliances39 Questions
Exam 9: Blueprint Reading and Drafting33 Questions
Exam 10: Material Organization and Layout26 Questions
Exam 11: Water Service Installation30 Questions
Exam 12: Water Distribution Installation35 Questions
Exam 13: Drainage,waste,and Vent Segments and Sizing30 Questions
Exam 14: Drainage,waste,and Vent Installation27 Questions
Exam 15: Fixture and Equipment Installation24 Questions
Exam 16: Plumbing Repairs and Troubleshooting27 Questions
Exam 17: Hydronic Heat25 Questions
Select questions type
MATCHING
Match the following terms:
-Vertical board to create a wall,categorized as load-bearing and non-load-bearing.
Free
(Multiple Choice)
4.9/5
(82)
Correct Answer:
F
MATCHING
Match the following terms:
-Tool that is ignited and creates a flame to solder or braze copper tube.
Free
(Multiple Choice)
4.9/5
(77)
Correct Answer:
A
The sizing of an entire system is established based solely on the type of fixtures being served.
Free
(True/False)
4.9/5
(73)
Correct Answer:
False
The layout of a water distribution system is not always the same.
(True/False)
4.9/5
(89)
PVC is rated to distribute water above 140 degrees and can therefore be used inside a home.
(True/False)
4.7/5
(67)
A joist has the same structural purpose and regulations as a wall stud.
(True/False)
4.9/5
(81)
MATCHING
Match the following terms:
-Horizontal board that is part of a complete framing system;categorized as floor and ceiling.
(Multiple Choice)
4.7/5
(73)
Maximum spacing between hangers and supports is dictated by codes,and all material types have the same maximum spacing between supports.
(True/False)
4.9/5
(74)
MATCHING
Match the following terms:
-Chemical paste to solder copper tube.
(Multiple Choice)
4.9/5
(85)
The size of the stop to be installed serving a fixture often determines the size of the rough-in water pipe more than the code.
(True/False)
4.8/5
(86)
MATCHING
Match the following terms:
-Metal filler used to braze copper tube;it has high silver content and is in stick form.
(Multiple Choice)
4.8/5
(91)
The location of a hole or notched area is regulated to make plumbing more convenient for plumbers.
(True/False)
4.8/5
(66)
MATCHING
Match the following terms:
-Fitting connection with a pipe.
(Multiple Choice)
4.8/5
(87)
The sealing compound used for threaded connections is known as _______________.
(Short Answer)
4.8/5
(74)
Doubling a pipe size provides twice the amount of water that a pipe can hold.
(True/False)
4.9/5
(73)
_______________ tubing uses a plastic securing clip,and _______________ utilizes a copper-plated clip.
(Short Answer)
4.8/5
(72)
Many green plumbing projects require that plumbers use primers and glues that are low ______________.
(Short Answer)
4.7/5
(81)
Showing 1 - 20 of 35
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)